Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
PRE SITE
-
Has site safety checklist been completed
SWITCHBOARD
-
Has cover been reinstalled securely
-
Sub board securely installed
-
Switch board/s labelled correctly
-
Switch board fire rated
-
All sub circuits correctly protected by rated circuit breakers and RCDs
-
Neutral conductors in order
-
All sub circuits and installation pass insulation resistance test
-
Busbar installed correctly
OUTSIDE
-
All items fit off, as per plan
-
All external vents installed for exhaust fans and range hoods
-
Items at correct heights, as per plan
-
Items clear of down pipes
-
Items protected with silicone
-
Damage to exterior
-
Items minimum clearance from gas meter
-
All rubbish and cable scraps cleaned up
INSIDE
-
All wall items fit off, as per plan
-
All items at correct heights, as per plan
-
All GPOs in working order
-
Oven GPO correctly labelled
-
I.P switches used where required
-
Wall items consistently straight & flush.
-
Damage or marks on walls
-
Damage or marks on walls, multiple.
-
Switching of lights in correct orientation, in reference to location of lights.
-
Switching of lights in correct orientation, in reference to location of lights. Multiple.
-
NBN fit off (henley)
-
NBN GPO fit off. (Carlisle)
-
All ceiling items fit off, as per plan
-
Lights in working order
-
Roof items flush with ceiling
-
Roof items straight
-
Damage or marks on ceiling
-
Damage or marks on ceiling. Multiple.
-
Fan and tastic covers straight
-
Warning signage for recessed lights put up in roof
-
Roof work completed correctly
-
Smoke detectors interlinked and full batteries installed
-
Job swept up and rubbish put in bin
-
Rangehood plug base secured
-
GPO's minimum clearance from sinks and tubs.
POST SITE
-
Fit off/count sheet completed correctly
-
Unfinished and/or Damage sheets completed correctly