Title Page

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location

PRE SITE

  • Pre site safety checklist completed

  • Circuits arranged to suit reasonable maximum demand

NBN AND STRUCTURED CABLE

  • NBN GPO wired to NBN (Carlisle & Fairhaven)

  • TV roof coils at correct location (manhole or NBN board for opticom estate)

  • Maintained separation of structured cables from electrical cables

  • Maintained desperation of structured cables from electrical cables, multiple

SWITCHBOARD

  • Feeds/mains in switchboard

  • Feeds/mains segregated from gas and water pipes

  • Switchboard cable entry ‘slide & cover’ reinstalled

  • Pole fillers reinstalled

  • Earth bond connected and zinc sprayed

  • Subboard locates as per plan

  • Measurements for subboard notes on plan

  • Correct sub mains ran, ie, 1 or 3 phase

  • Correct cable sizes used for AC and seperate circuits

WALLS

  • All brackets installed

  • Cables easily accessible at brackets. Ie, not knocked down

  • Cables easily accessible at brackets. Multiple

  • N/C measurements on plan

  • Garage wall measurements on plan

  • All switchlines labelled

  • All items as per plan

  • All heights as per plan

  • Client / plan specific measurements followed

  • GPOs in wet areas at minimum height and distance

  • WM GPO as per plan and REGULATIONS

  • Bathroom / en-suite GPO loop measurements on plan

  • Bathroom / en-suite switch height allowed for towel rail

  • Cables clear of return air void

  • Holes drilled in brace board, maximum 100mm

  • Holes drilled in walls and top plates, min 300mm apart

  • Holes drilled in walls and top plates, min 300mm apart. More than 1

  • Holes drilled in walls and top plates, min 300mm apart, 3 or more

  • Holes 300mm from bracing

  • Holes 300mm from bracing. More than 1

  • Holes 300mm from bracing. 3 or more

  • 25mm segregation from pipes

  • 25mm segregation from pipes. More than 1

  • 25mm segregation from pipes. 3 or more

  • Oven & cooktop wired correctly. Ie, upright/ wall oven/ induction

  • Island bench power ran and in corrugated conduit

  • Kitchen measurements correct and noted on plan

  • Rangehood nogged or timber in space

ROOF / LIGHTS

  • All light measurements on plan

  • Light measurements clear of pipes, ducting, tv and data

  • Step lights single end location noted on plan

  • Kitchen strip light / under cupboard lights roughed in correctly. Location and accessibility of cables

  • 2 ways / 3 ways ran correctly

  • Smoke detector located as per regs

  • Smoke detectors interconnected

  • Cables securely supported on trusses

  • Cables securely supported on trusses. Multiple

  • Switchlines clipped in line with mark

  • Switchlines clipped in line with mark. Multiple

  • Switching of lights roughed in as per plan

  • In roof JBs fit off at rough in and noted on plan

  • Pendant and fan nogs installed

  • Plug bases and quick connects fit off

  • Correct exhaust fan and tastic measurements

  • Exhaust fans and tastics clear of obstructions

  • Exhaust fans, tastic and rangehood ducted

  • Roof work in correct locations

  • Roof work locations marked on plan

  • Roof work fit off at rough in

  • Holes drilled <300mm apart in joists

  • Holes drilled <300mm apart in joists. More than 1

  • Holes drilled <300mm apart in joist. 3 or more

OUTSIDE

  • Externals through brickwork / hebel

  • Externals heights as per plan

  • Clear of downpipes

  • Clear of downpipes. Multiple

  • HWS GPO in correct locational

  • AC isolator in correct location

  • External vents brought through brickwork / hebel if complete. Measurements provided if not.

  • Electrical items 1000mm clear of gas pipe

POST INSULATION

  • Insulation installed upstairs ceiling

  • Insulation installed downstairs ceiling

  • If plaster battens installed, are they clear of light measurements?

  • Insulation clearance for exhaust fans and tastics

  • Clipping to location between trusses (lines up with mark)

  • N/C measurements still clipped to mark

  • GPO loops in wall placed infront of wall batts

  • Wall lights placed infront of wall batts

  • Heater and light fit off

  • EVAP fit off

  • Owners cable added

  • Nogs installed and cable poked through in rooms with BH deemed inaccessible

  • Items that require attention due to insulation installers

POST SITE

  • Site has been swept up and rubbish put in bin

  • Detailed unfinished report completed

  • Moved items on unfinished report

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.