Title Page

  • Job Number

  • General Contractor

  • Conducted on

  • Project Manager

  • Floor / Area Worked

  • Tempurature

  • Confirm that all sheet metal flashing has been installed prior to paper

  • Notes

  • Add media

  • Confirm that backing is installed to trims and that true expansion joints are framed for the correct size of joint

  • Notes

  • Add media

  • Confirm primer for the flexible membrane has been installed in necessary locations

  • Notes

  • Add media

  • Confirm flexible membrane has been installed over milcor flanges

  • Notes

  • Add media

  • Confirm flexible membrane has been installed behind trims

  • Notes

  • Add media

  • Confirm flexible membrane has been lapped more than 3"

  • Notes

  • Add media

  • Insure that paper has been lapped 4" horizontally and 16" vertically

  • Notes

  • Add media

  • Confirm proper waterproofing has been installed per manufacturers recommendations if 60-minute paper is not specified

  • Notes

  • Add media

  • Confirm that two layers of 60-minute paper has been applied

  • Notes

  • Add media

  • Check and confirm correct lath laps for materials used (1" horizontally 1/2" vertically on 3.4 & 2.5 & stucco netting 2 1/2")

  • Notes

  • Add media

  • Confirm the correct fasteners have been used and are installed 6" OC

  • Notes

  • Add media

  • Confirm that lath between stud bays is tied

  • Notes

  • Add media

  • Visually check all holes, dead screws and trims have been caulked (all sill screws must be caulked to cover screw head completely)

  • Notes

  • Add media

  • Confirm that all ceilings are wire tied and that supports are 13 1/2" O.C. maximum

  • Notes

  • Add media

  • Confirm all trims are plumb and true per details

  • Notes

  • Add media

  • Confirm control joint layout are under 120/sq. ft., and that they comply with industry standards and job specifications

  • Notes

  • Add media

  • Confirm band aids or diagonal strips have been applied at heads and sills of openings

  • Notes

  • Add media

  • Confirm control joints installed prior to lath. Lath is not continuous through control joints

  • Notes

  • Add media

  • Confirm all the above have been completed per the plans and specs

  • Notes

  • Add media

  • Sign Off

  • Forman

  • Q.C. Sign Off

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.