Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Client Details
-
Full name
-
Contact Person
-
Office Location
-
Postal Address
-
Phone, Fax, Email
-
Scope of Main Activities
-
Is there a documented procedure for identify legal and other requirements for this project?
-
Is there a documented OHS management plan for this project?
-
Does the plan include specific OHS controls or actions that need to be implemented during the safe site set-up?
-
Is there a documented procedure describing the method used for identifying and assessing OHS hazards associated with the activities on this project?
-
Have these hazards been evaluated for their impact on people and is this documented?
-
Is there a documented procedure for evaluating controls based on a hierarchy of reasonably practicable?
-
Have roles, responsibilities and authorities of the OHS Management Plan been defined, documented and communicated to all personnel to ensure effective OHS Management?
-
Is there a procedure for Safe Site Start and has it been provided to the Site or Project manager?
-
Licenses, competencies and permits required?
-
Are there procedures for communicating issues related to the identified occupational health and safety risks and the OHSMS?
-
Were there any corrective actions from the Safe Site Establishment and have they been addressed? Is this documented?
-
What if any are the most significant health surveillance requirements for the project; is this documented?
-
Is there a procedure showing how results of monitoring and health surveillance will be communicated to relevant employees?
-
4.5.3 Records and records management<br>Is there a procedure to ensure that occupational health and safety records are:<br>- Identified<br>- Maintained in accordance with AS/NZS 4801<br>- Controlled<br>- Legible.<br>- Identifiable<br>- Readably and retrievable<br>- Protected against damage, deterioration or loss<br>- retained for a specific period<br>
-
Has VOS IMS SWMS been completed specifically for Site establishment activities?
-
Has a project management Plan been completed?
-
Are project hazards and areas of priority (client specifications) included?
-
Are licenses, competencies and permits for work been identified?
-
Have all personnel been briefed on the plan in particular to Site Establishment?
-
Have emergency response procedures been documented and implemented?<br>
-
Are personnel aware of emergency response procedures, has this been tested?
-
Has a suitable Work Method Statement been completed from the project hazard and risk assessment?
-
Have all personnel viewed and signed-off accordingly?
-
Does the SWMS include inspection and test hold points
-
Have all steps in the site Establishment procedure been followed and reported back to the project manager?
-
Licenses, competencies and permits, received and filed accordingly?
-
Have any ‘Action Required report forms been completed for any corrective actions encountered through Site Establishment?<br>
-
Have Rosebery Mine representatives been identified and are lines of communications working as planned?
-
Have all steps in the site Establishment procedure been followed and reported back to the project manager?
-
Have monitoring requirements been identified, implemented and results recorded?
-
Have all referred documentation been completed, recorded and filed?
Sign-off
-
Participants
-
Auditor
-
Select date