Information
-
Site conducted
-
Tool #
-
Client / Site
-
Conducted on
-
Prepared by
-
Personnel
Daily Inspection / Final Inspection / GP-12 Inspection / Gage Check
-
Verify the inspection criteria and frequency of the inspection checks match as per control plan.<br>Verify the documentation related to Daily inspection sheet /log completed properly including lot numbers for all components recorded<br>Verify inspection methods include Touch, Listen, and Count for quality checks
-
Verify the inspection area have adequate lighting
-
Verify the reaction plan appropriate for the inspection findings. Refer to Inspector Daily Inspection Log
-
Verify the inspection methodology includes point, touch, listen and count etc. and check the inspection is performed as per the defined instructions.
-
Verify the Gage & Gage nest is cleaned, calibrated, variable /attribute gages are present and not damaged ( Verify the calibration/certification sticker) (see Quality Tech to confirm calibration sheet has traceability for instrument used during calibration/verification)
-
Verify the Gage instructions are available and tolerance are defined on the control plan/gage instruction and data meets defined tolerances.
-
Verify the SPC log history for any out of tolerance( under or above tolerance). See Quality Engineer for data
-
Verify highest scrap is logged on the Communication Board for each shift. Verify Monthly charts are posted.
-
Quality Concern Charts are updated, Posted in Production meeting area
-
Review the posted charts of top defects (What are the top defects and what is next issue to be worked on). Refer to CI Board
-
Review Red Rabbits for tool being audited and confirm they are all signed and dated. Date must be within the last 6 months.
Maintenance
-
Verify the tool and Fixture PM completed as per the schedule. No past due for tools and fixtures.
-
Verify the daily / Weekly/monthly /Quarterly PMs for machine, robot, conveyor. Thermolaters, fire extinguishers, eye wash, hilos, cranes etc. <br>Verify two PM books for completeness.
-
Verify Chemicals are identified, stored and handled properly as per SDS
-
Is Used Oil storage area clean and organized? - Oily rags in an empty colorant drum lined with a plastic bag and placed on a pallet? - Used oil stored on top of grated area? - Work instructions posted?
-
Verify the critical spare parts are identified and review the list for availability of spare parts.
-
Is the Universal Waste Storage Area organized and all waste properly stored? Verify waste is dated and prevented from accidental damage.
-
Screw safe guarding is in place?
Signature of Auditor
-
Signature of Auditor at completion of audit