Title Page

  • Conducted on

  • Prepared by

  • Line Supervisor

  • Signature

Stage 10A:Front side & back side O ring assembly on Integration Plate

Stage 10A:Front side & back side O ring assembly on Integration Plate

  • Equipment at the stage:(A) Stage Fixture,There is no other equipment at the workstation

  • Operator must wear apron & Safety Shoes.

  • DMI (Detailed Manufacturing Instruction) must be displayed and operator must be followed DMI.

  • Operator Must followed Check Do Check process

  • 5s should be maintained at work station.

  • Red bin must be available for rejection material at stage.

  • Waste parts should not be spread over the shop floor & working table.

  • All material must be identify and placed at defined location

  • Operator must be skilled.

  • Operator ID

Stage 10: Barcode pasting & Integration plate mounting on Elster Mechanical unit

Stage 10: Barcode pasting & Integration plate mounting on Elster Mechanical unit

  • Equipment at the stage:(A) Stage Fixture,(B)Barcode Printer,(C) Screw Driver,There is no other equipment at the workstation

  • Operator must wear apron & Safety Shoes.

  • DMI (Detailed Manufacturing Instruction) must be displayed and operator must be followed DMI.

  • Positve control must be done by operator.

  • Precontrol must be done by line supervisor.

  • Operator must followed Check Do Check process

  • Barcode printing must not not be spread .

  • Screw Driver & Torque wrench must be calibrated.

  • 5s should be maintained at work station.

  • Operatror must follow single piece flow process.

  • Waste parts should not be spread over the shop floor & working table.

  • All material must be identify and placed at defined location.

  • Operator must be skilled.

  • Operator ID

Satge 20A: Soldering & Depanelling of PTH Panel

Satge 20A: Soldering & Depanelling of PTH Panel

  • Equipment at the stage:(a) Soldring Iron,(B)Fuem extractor,(C)Stage Fixture(D)Depenaling tool,There is no other equipment at the workstation

  • Operator must wear apron.

  • DMI (Detailed Manufacturing Instruction) must be displayed and operator must be followed DMI.

  • Positve control must be done by operator.

  • Operator must followed Check Do Check process

  • 5s should be maintained at work station.

  • Red bin must be available for rejection material at stage.

  • Waste parts should not be spread over the shop floor & working table.

  • No bridging,excessive solder past apply on soder joint.

  • All material must be identify and placed at defined location

  • Operator must be skilled.

  • Operator ID

Stage 20 :Internal Magnet Assay, PCB mounting on integration plate, EU base on Gas meter

  • Equipment at the stage:(A) Stage Fixture,There is no other equipment at the workstation

  • Operator must wear apron & Safety Shoes.

  • DMI (Detailed Manufacturing Instruction) must be displayed and operator must be followed DMI.

  • Operator must followed Check Do Check process

  • Magnate must be free from dust partical .

  • 5s should be maintained at work station.

  • Waste parts should not be spread over the shop floor & working table.

  • All material must be identify and placed at defined location

  • Operatror must follow single piece flow process.

  • Operator must be skilled.

  • Operator ID

Stage 30 :3x Nut tightning on EU

Stage 30 :3x Nut tightning on EU

  • Equipment at the station:(a)EU covers assy. Fixture,(B)Screw driver,(C) Air gun,There is no other equipment at the workstation.

  • Operator must wear anti static apron, Safety Shoes and wrist belt.

  • DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.

  • Positve control must be done by operator.

  • Operator must followed Check Do Check process

  • Precontrol must be done by line supervisor.

  • Wrist belt and ESD mat must connected to earth point

  • Wrist belt must be test by operator at the starting of line.

  • All electrical connection must not be loose and must be safe.

  • Work station must be free from dust, unused material and tools.

  • Screw driver must be calibrated.

  • All material must be identify and placed at defined location.

  • Waste parts should not be spread over in the shop floor & working table.

  • Seafty curtain maust be in working condition.

  • Operator must follow single piece flow process.

  • Operator must be skilled.

Stage 40 :EU functional testing

Stage 40 :EU functional testing

  • Equipment at the stage:(A) Stage Fixture,There is no other equipment at the workstation

  • Operator must wear apron & Safety Shoes.

  • DMI (Detailed Manufacturing Instruction) must be displayed and operator must be followed DMI.

  • Operator must followed Check Do Check process

  • 5s should be maintained at work station.

  • Red bin must be available for rejection material at stage.

  • Waste parts should not be spread over the shop floor & working table.

  • All material must be identify and placed at defined location

  • Operator must follow single piece flow process.

  • Operator must be skilled.

  • Opeartor ID

Satge 50: MID Seal Pressing on EU

  • Satge 50: MID Seal Pressing on EU

  • Equipment at the stage:(A) Stage Fixture,There is no other equipment at the workstation

  • Operator must wear apron & Safety Shoes.

  • DMI (Detailed Manufacturing Instruction) must be displayed and operator must be followed DMI.

  • Operator must followed Check Do Check process

  • 5s should be maintained at work station.

  • Red bin must be available for rejection material at stage.

  • Positve control must be done by operator.

  • MID seal must be properly pressed.

  • Waste parts should not be spread over the shop floor & working table.

  • Safety curtain must be in working condition.

  • All material must be identify and placed at defined location

  • Operator must follow single piece flow process.

  • Operator must be skilled.

  • Operator ID

Stage 60 : 2 x Brass Nut tightening on EU

Stage 60 : 2 x Brass Nut tightening on EU

  • Equipment at the station:(a) EU covers assymbly Fixture.(B)Screw driver,(c) Air gun ,There is no other equipment at the workstation

  • Operator must wear anti static apron, Safety Shoes and wrist belt.

  • DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.

  • Operator must followed Check Do Check process

  • Positve control must be done by operator.

  • Precontrol must be done by line supervisor.

  • Wrist belt and ESD mat must connected to earth point

  • Wrist belt must be test by operator at the starting of line.

  • All electrical connection must not be loose and must be safe.

  • Work station must be free from dust, unused material and tools.

  • Screw driver must be calibrated.

  • All material must be identify and placed at defined location.

  • Waste parts should not be spread over in the shop floor & working table.

  • Seafty curtain maust be in working condition.

  • Operator must follow single piece flow process.

  • Operator must be skilled.

  • Operator ID

Stage 70 : 2x Plastic Seal Pressing on EU

Stage 70 : 2x Plastic Seal Pressing on EU

  • Equipment at the stage:(A) Stage Fixture,There is no other equipment at the workstation

  • Operator must wear apron & Safety Shoes.

  • DMI (Detailed Manufacturing Instruction) must be displayed and operator must be followed DMI.

  • Operator must followed Check Do Check process

  • Plastic seal must be properly pressed.

  • Positve control must be done by operator.

  • 5s should be maintained at work station.

  • Red bin must be available for rejection material at stage.

  • Waste parts should not be spread over the shop floor & working table.

  • Safety curtain must be in working condition.

  • All material must be identify and placed at defined location

  • Operator must be skilled.

  • Operator ID

Satge 80: Calibration & verification

  • Satge 80: Calibration & verification

  • Equipment at the station:(A) Test Bench,(B)Temp. & Humidity Logger,There is no other equipment at the workstation

  • Operator must wear apron, Gloves & Safety Shoes.

  • DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.

  • Operator must followed Check Do Check process

  • Work Station light must be switched on and working.

  • Work station must be free from dust, unused material and tools.

  • Date of next calibration of sonic nozzle, temp., and pressure and humidity sensor must be marked.

  • Lab temp. 20°C ± 1°C & humidity 50% ± 10% must be maintain.

  • Preventive maintanance by operator and maintenance team.

  • All material should be identified and should be on defined location.

  • All electrical Connection should be safe .

  • Waste parts should not be spread over in the shop floor & working table.

  • Red bin must be available for rejection material at stage.

  • Opeartor must be skilled.

  • Operator ID

Satge 90,100 : Visual Inspection & Cleaning +Port Cover Assembly

Satge 90,100 : Visual Inspection & Cleaning +Port Cover Assembly

  • Stuff at the station:(a) Pine shower,(b) clothes,There is no other equipment at the workstation.

  • Operator must wear Apron, Gloves and Safety Shoes.

  • Work Instruction Must be displayed and Operator must follow Work instruction

  • Operator must follow Check Do Check Process.

  • Work Station light must be switched on and working.

  • Work station must be free from dust, unused material and tools.

  • All material must be identify and placed at defined location.

  • Waste parts should not be spread over in the shop floor & working table.

  • Red bin must be available for rejection material at stage.

  • Operator must follow single piece flow process.

  • Operator must be skilled.

  • Operator ID

Satge 110 :Prepack

  • Satge 110 :Prepack

  • Equipment at the station:(1)Stage fixture,There is no other equipment at the workstation

  • Operator must wear Apron, Safety Shoes.

  • DMI must be displayed on station andOperator must follow DMI.

  • Operator must followed Check Do Check Process.

  • Upper case assembly fixture must be stable and fix while working.

  • Work station must be free from dust, unused material and tools.

  • All material must be identify and placed at defined location.

  • Waste parts should not be spread over in the shop floor & working table.

  • All electrical connection should not be loose and should be safe.

  • Red bin must be available for rejection material at stage.

  • Operator must followed single piece flow process.

  • Operator must follow single piece flow process.

  • Operator must be skilled.

  • Operator ID

Stage 120 :Inspection Stage

Stage 120 :Inspection Stage

  • Operator must wear apron & Safety Shoes.

  • Work Instruction must be displayed and Inspector must followed work instruction.

  • Inspection Sheet must be available .

  • Work Station light must be switched on and working.

  • Work station must be free from dust, unused material and tools.

  • Waste parts should not be spread over in the shop floor & working table.

  • Red bin must be available for rejection material at stage.

  • Operator must followed single piece flow process.

  • Operator must be skilled.

  • Operator ID

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.