Title Page
-
Conducted on
-
Prepared by
-
Line Supervisor
-
Signature
Stage 10A:Front side & back side O ring assembly on Integration Plate
Stage 10A:Front side & back side O ring assembly on Integration Plate
-
Equipment at the stage:(A) Stage Fixture,There is no other equipment at the workstation
-
Operator must wear apron & Safety Shoes.
-
DMI (Detailed Manufacturing Instruction) must be displayed and operator must be followed DMI.
-
Operator Must followed Check Do Check process
-
5s should be maintained at work station.
-
Red bin must be available for rejection material at stage.
-
Waste parts should not be spread over the shop floor & working table.
-
All material must be identify and placed at defined location
-
Operator must be skilled.
-
Operator ID
Stage 10: Barcode pasting & Integration plate mounting on Elster Mechanical unit
Stage 10: Barcode pasting & Integration plate mounting on Elster Mechanical unit
-
Equipment at the stage:(A) Stage Fixture,(B)Barcode Printer,(C) Screw Driver,There is no other equipment at the workstation
-
Operator must wear apron & Safety Shoes.
-
DMI (Detailed Manufacturing Instruction) must be displayed and operator must be followed DMI.
-
Positve control must be done by operator.
-
Precontrol must be done by line supervisor.
-
Operator must followed Check Do Check process
-
Barcode printing must not not be spread .
-
Screw Driver & Torque wrench must be calibrated.
-
5s should be maintained at work station.
-
Operatror must follow single piece flow process.
-
Waste parts should not be spread over the shop floor & working table.
-
All material must be identify and placed at defined location.
-
Operator must be skilled.
-
Operator ID
Satge 20A: Soldering & Depanelling of PTH Panel
Satge 20A: Soldering & Depanelling of PTH Panel
-
Equipment at the stage:(a) Soldring Iron,(B)Fuem extractor,(C)Stage Fixture(D)Depenaling tool,There is no other equipment at the workstation
-
Operator must wear apron.
-
DMI (Detailed Manufacturing Instruction) must be displayed and operator must be followed DMI.
-
Positve control must be done by operator.
-
Operator must followed Check Do Check process
-
5s should be maintained at work station.
-
Red bin must be available for rejection material at stage.
-
Waste parts should not be spread over the shop floor & working table.
-
No bridging,excessive solder past apply on soder joint.
-
All material must be identify and placed at defined location
-
Operator must be skilled.
-
Operator ID
Stage 20 :Internal Magnet Assay, PCB mounting on integration plate, EU base on Gas meter
-
Equipment at the stage:(A) Stage Fixture,There is no other equipment at the workstation
-
Operator must wear apron & Safety Shoes.
-
DMI (Detailed Manufacturing Instruction) must be displayed and operator must be followed DMI.
-
Operator must followed Check Do Check process
-
Magnate must be free from dust partical .
-
5s should be maintained at work station.
-
Waste parts should not be spread over the shop floor & working table.
-
All material must be identify and placed at defined location
-
Operatror must follow single piece flow process.
-
Operator must be skilled.
-
Operator ID
Stage 30 :3x Nut tightning on EU
Stage 30 :3x Nut tightning on EU
-
Equipment at the station:(a)EU covers assy. Fixture,(B)Screw driver,(C) Air gun,There is no other equipment at the workstation.
-
Operator must wear anti static apron, Safety Shoes and wrist belt.
-
DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.
-
Positve control must be done by operator.
-
Operator must followed Check Do Check process
-
Precontrol must be done by line supervisor.
-
Wrist belt and ESD mat must connected to earth point
-
Wrist belt must be test by operator at the starting of line.
-
All electrical connection must not be loose and must be safe.
-
Work station must be free from dust, unused material and tools.
-
Screw driver must be calibrated.
-
All material must be identify and placed at defined location.
-
Waste parts should not be spread over in the shop floor & working table.
-
Seafty curtain maust be in working condition.
-
Operator must follow single piece flow process.
-
Operator must be skilled.
Stage 40 :EU functional testing
Stage 40 :EU functional testing
-
Equipment at the stage:(A) Stage Fixture,There is no other equipment at the workstation
-
Operator must wear apron & Safety Shoes.
-
DMI (Detailed Manufacturing Instruction) must be displayed and operator must be followed DMI.
-
Operator must followed Check Do Check process
-
5s should be maintained at work station.
-
Red bin must be available for rejection material at stage.
-
Waste parts should not be spread over the shop floor & working table.
-
All material must be identify and placed at defined location
-
Operator must follow single piece flow process.
-
Operator must be skilled.
-
Opeartor ID
Satge 50: MID Seal Pressing on EU
-
Satge 50: MID Seal Pressing on EU
-
Equipment at the stage:(A) Stage Fixture,There is no other equipment at the workstation
-
Operator must wear apron & Safety Shoes.
-
DMI (Detailed Manufacturing Instruction) must be displayed and operator must be followed DMI.
-
Operator must followed Check Do Check process
-
5s should be maintained at work station.
-
Red bin must be available for rejection material at stage.
-
Positve control must be done by operator.
-
MID seal must be properly pressed.
-
Waste parts should not be spread over the shop floor & working table.
-
Safety curtain must be in working condition.
-
All material must be identify and placed at defined location
-
Operator must follow single piece flow process.
-
Operator must be skilled.
-
Operator ID
Stage 60 : 2 x Brass Nut tightening on EU
Stage 60 : 2 x Brass Nut tightening on EU
-
Equipment at the station:(a) EU covers assymbly Fixture.(B)Screw driver,(c) Air gun ,There is no other equipment at the workstation
-
Operator must wear anti static apron, Safety Shoes and wrist belt.
-
DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.
-
Operator must followed Check Do Check process
-
Positve control must be done by operator.
-
Precontrol must be done by line supervisor.
-
Wrist belt and ESD mat must connected to earth point
-
Wrist belt must be test by operator at the starting of line.
-
All electrical connection must not be loose and must be safe.
-
Work station must be free from dust, unused material and tools.
-
Screw driver must be calibrated.
-
All material must be identify and placed at defined location.
-
Waste parts should not be spread over in the shop floor & working table.
-
Seafty curtain maust be in working condition.
-
Operator must follow single piece flow process.
-
Operator must be skilled.
-
Operator ID
Stage 70 : 2x Plastic Seal Pressing on EU
Stage 70 : 2x Plastic Seal Pressing on EU
-
Equipment at the stage:(A) Stage Fixture,There is no other equipment at the workstation
-
Operator must wear apron & Safety Shoes.
-
DMI (Detailed Manufacturing Instruction) must be displayed and operator must be followed DMI.
-
Operator must followed Check Do Check process
-
Plastic seal must be properly pressed.
-
Positve control must be done by operator.
-
5s should be maintained at work station.
-
Red bin must be available for rejection material at stage.
-
Waste parts should not be spread over the shop floor & working table.
-
Safety curtain must be in working condition.
-
All material must be identify and placed at defined location
-
Operator must be skilled.
-
Operator ID
Satge 80: Calibration & verification
-
Satge 80: Calibration & verification
-
Equipment at the station:(A) Test Bench,(B)Temp. & Humidity Logger,There is no other equipment at the workstation
-
Operator must wear apron, Gloves & Safety Shoes.
-
DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.
-
Operator must followed Check Do Check process
-
Work Station light must be switched on and working.
-
Work station must be free from dust, unused material and tools.
-
Date of next calibration of sonic nozzle, temp., and pressure and humidity sensor must be marked.
-
Lab temp. 20°C ± 1°C & humidity 50% ± 10% must be maintain.
-
Preventive maintanance by operator and maintenance team.
-
All material should be identified and should be on defined location.
-
All electrical Connection should be safe .
-
Waste parts should not be spread over in the shop floor & working table.
-
Red bin must be available for rejection material at stage.
-
Opeartor must be skilled.
-
Operator ID
Satge 90,100 : Visual Inspection & Cleaning +Port Cover Assembly
Satge 90,100 : Visual Inspection & Cleaning +Port Cover Assembly
-
Stuff at the station:(a) Pine shower,(b) clothes,There is no other equipment at the workstation.
-
Operator must wear Apron, Gloves and Safety Shoes.
-
Work Instruction Must be displayed and Operator must follow Work instruction
-
Operator must follow Check Do Check Process.
-
Work Station light must be switched on and working.
-
Work station must be free from dust, unused material and tools.
-
All material must be identify and placed at defined location.
-
Waste parts should not be spread over in the shop floor & working table.
-
Red bin must be available for rejection material at stage.
-
Operator must follow single piece flow process.
-
Operator must be skilled.
-
Operator ID
Satge 110 :Prepack
-
Satge 110 :Prepack
-
Equipment at the station:(1)Stage fixture,There is no other equipment at the workstation
-
Operator must wear Apron, Safety Shoes.
-
DMI must be displayed on station andOperator must follow DMI.
-
Operator must followed Check Do Check Process.
-
Upper case assembly fixture must be stable and fix while working.
-
Work station must be free from dust, unused material and tools.
-
All material must be identify and placed at defined location.
-
Waste parts should not be spread over in the shop floor & working table.
-
All electrical connection should not be loose and should be safe.
-
Red bin must be available for rejection material at stage.
-
Operator must followed single piece flow process.
-
Operator must follow single piece flow process.
-
Operator must be skilled.
-
Operator ID
Stage 120 :Inspection Stage
Stage 120 :Inspection Stage
-
Operator must wear apron & Safety Shoes.
-
Work Instruction must be displayed and Inspector must followed work instruction.
-
Inspection Sheet must be available .
-
Work Station light must be switched on and working.
-
Work station must be free from dust, unused material and tools.
-
Waste parts should not be spread over in the shop floor & working table.
-
Red bin must be available for rejection material at stage.
-
Operator must followed single piece flow process.
-
Operator must be skilled.
-
Operator ID