This audit is divided into two sections. The first section is "expert led". The second section is "codified".
This audit is based on the Improving the Business / Situational level of the Operating System.
EXPERT LED
Expert led
-
Formal process of implementation used - Project Boards, A3's, PDCA etc
-
Adequate time allocated to teams to work on improvement projects
-
Good VM principles in use
-
Good use of visual controls
-
Good use of TRACC implementation modules - Maps and Manuals
-
Good use of DigiTRACC - for assessments, planning etc
-
Project meetings well attended
-
Running effective meetings criteria applied and effective
-
Adequate training of Project Teams
-
Good project close out procedures followed
-
Projects achieve desired results
CODIFIED
Codified
-
MEX vision understood by all
-
Demonstrable understanding of Foundation TRACCs in PROJECT TEAMS
-
Formal and documented systems for MEX processes
-
Significant bottom line gains (50% improvement) in the project
-
Loss and Waste driving the project with clear links
-
Formal improvement process for Projects, use of A3's and PDCA's
-
Very effective improvement structures Project Teams (Measure?)
-
Very effective deployment to the team of BBP and LION MEX A3 with visual links
-
Very high levels of engagement at all levels in MEX, empowered (willing, able, allowed, accountable) with tangible results. (Measure?)
-
Foundation practises entrenched in the Team - >3 for TW, 5S, VM, FI