Information
-
Document No. 01-2014
-
Quality Control on Bridge Shrouds
-
Ministry of Transportation and Infrastructure.
-
Conducted on
-
Prepared by David Turenne
-
Location
-
Quality Control Inspectors, Todd Mcvey, Mike Lee or David Turenne
Safety Procedures
-
Are safety procedures being followed (Observed)
-
Has an Hazard Assessment been done for this activity?
-
Has a Pre-Work Safety meeting been done on site
-
Are all recommended PPE being used for the activity?
-
Are all workers aware of known Hazards?
Traffic Management
-
Is Traffic Control required at this site?
-
Is the Traffic Management Plan being followed?
-
Is there a need to adjust the Traffic Plan in order to changing needs?
Survey/Layout Conformance
-
Is the Shroud in the right location
-
Does the shroud fit as per the Drawing 0788-102, 0788-103, 0788-104, 0788-105<br>
Material Conformance
-
Are the Mill Certificates supplied with the Stainless Steel Shrouds?
-
Does the steel conform to the drawings? 3.5mm thick Grade 316 Stainless Steel Plate
-
Are the Bolts, washers and nuts Stainless steel as per the drawings?
-
Does the welder have CWB certification? (Photocopy or Photo)
-
Is the adhesive as per MOTI spec, Sika flex 221 or Non-sag Polyurethane or Equivalent?
Shroud installation
-
Has the area been cleaned prior to adhesive application?
-
Are the shroud pieces bolted as per drawings 0788-102, 0788-103, 0788-104, 0788-105
-
Are the Shrouds anchored to the Concrete as per the drawings?
-
Is the Evasote fit as per the drawings with attention to a good seal?
-
After installation, do the shrouds leak?