Title Page
-
Site conducted
- TAQA Neyveli Power Company Pvt Ltd
- -
-
Conducted on
-
Audited by
-
Work Description
-
Isolation performed by
-
Location
-
PTW No
-
PTW Issued on
LOTO - Field Verification
-
LOTO Tag available at the equipment
-
Energy Isolation is carried out (Electrical/ Mechanical/Any other Energy)
-
Motor Space Heater isolation is required for the permit
- Yes
- No
- N/A
-
Space heater MCB is isolation carried out
- MCB switched Off and Tagged
- MCB switched Off and not Tagged
- MCB not switched Off ; but Tagged
- MCB Not switched Off and not Tagged
-
Motor EPB Condition
- Applied and Tagged
- Not Applied; But tagged
- Not applied and Not Tagged
-
Valve isolations were locked with the chain
-
Drain valves Condition
- Open and locked condition
- Open and Not locked condition
- Closed and tagged condition
- Closed and Not tagged condition
-
Vent Valves Condition
- Opened, Locked, Tagged condition
- Opened, Not locked and Tagged condition
- Closed condition; Not locked and tagged
- Closed condition; Locked and tagged
LOTO - Tag Details Verification
-
PTW - Details recorded in Tag
-
Isolation Lock No displayed
-
If the same isolation is used for multiple permits
-
Linked, Child permit details recorded
-
Equipment KKS - recorded
-
Field Operator Name - recorded
-
Field Operator signed in the Tag
LOTO - Detail report Verification
-
LOTO Selected list meets the job requirement
-
LOTO report signed by ASCE
-
LOTO Report signed by Isolation operator
-
LOTO report captures the Master box details
-
LOTO report captures the lock details
Untitled Page