Long Hole Pre-Exit Inspection
DRILLING CHECKLIST
-
Have collars been surveyed?
-
Have all collars been checked?
-
Are all holes drilled/reported?
-
Do all holes conform to layout?
-
All N.F.G holes plugged?
-
Are all holes completed without the need of redrills?
-
Fanbacks tagged/painted/flagged?
-
Are holes properly cased/flagged?
-
Are all holes in good condition (not squeezed)?
-
Is ousekeeping/cleanup up to standard?
SIGN OFF: (AGREED THAT DRILL CAN BE DEMOBILIZED)
-
LH Technician/Planer:
-
Company LH Shifter: