Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Frame and patio door inspection check sheet

  • Client: Wates construction

  • Job title: Wembley Park NW07 NW08

  • MPrice inspection

  • Location

  • Block or phase

Frame inspection

  • Is frame installed to gridline & datum?

  • Have correct fixings been used?

  • Have the correct packers/shims been used?

  • Have bolts on brackets been torqued correctly?

  • Are frame mitres intact and closed?

  • Are all frames clean and damage free?

Doors & windows

  • Are doors and windows fitted level?

  • Are doors and windows operational?

  • Do they open smoothly?

  • Do they lock and unlock?

  • Is correct restriction fitted?

  • Has the trickle vents been installed correctly and operating?

  • Has all weep caps been installed ?

GLASS INSPECTION

  • Has the glass been toe and healed correctly?

  • Is the glass damage free and clean?

  • Has the correct spec been used in the correct locations ?

  • Wedge gaskets installed correctly ?

Fire stops.

  • Have all fire stops been installed correctly & spec used I.E correct fixings, brackets, compression, fire mastic?

Phot of works

  • Photo of works

Comments

  • Are there any comments

Signatures

  • On behalf of MPrice

  • On behalf of Wates

End of report

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.