Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Frame and patio door inspection check sheet
-
Client: Wates construction
-
Job title: Wembley Park NW07 NW08
-
MPrice inspection
-
Location
-
Block or phase
Frame inspection
-
Is frame installed to gridline & datum?
-
Have correct fixings been used?
-
Have the correct packers/shims been used?
-
Have bolts on brackets been torqued correctly?
-
Are frame mitres intact and closed?
-
Are all frames clean and damage free?
Doors & windows
-
Are doors and windows fitted level?
-
Are doors and windows operational?
-
Do they open smoothly?
-
Do they lock and unlock?
-
Is correct restriction fitted?
-
Has the trickle vents been installed correctly and operating?
-
Has all weep caps been installed ?
GLASS INSPECTION
-
Has the glass been toe and healed correctly?
-
Is the glass damage free and clean?
-
Has the correct spec been used in the correct locations ?
-
Wedge gaskets installed correctly ?
Fire stops.
-
Have all fire stops been installed correctly & spec used I.E correct fixings, brackets, compression, fire mastic?
Phot of works
-
Photo of works
Comments
-
Are there any comments
Signatures
-
On behalf of MPrice
-
On behalf of Wates