    Frame and patio door setting out check sheet
  • Client: Kier Construction

  • Job title: One Station Square D-52 Part 2 Rev A

  • MPrice Handover Inspection

  • Location

Frame inspection

  • Is frame installed to gridline & datum?

  • Frames installed within specified tolerance ?

  • Has specified fixings been checked?

  • Are all fixings present correctly tiehtend ?

  • All shims and isolators in place?

  • All brackets fixings correct grade and correctly tightened?

  • Any required pull out or load testing carried out successfully?

  • Required expansion allowance included in frame and in fixing points?

  • Have the correct packers/shims been used?

  • Are all frames clean and damage free?

  • Are all the glass scratch free?

Comments

  • Are there any comments

Signatures

  • On behalf of MPrice

  • On behalf of Kier Construction

End of report

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.