Information

  • WestConnex M4E.png
  • Site Location

  • Conducted on

Area Supervisor:-

Lead Inspector:-

Other members of the inspection team?

  • Another auditor

  • Is there a valid Work Permit and approved SWMS in place for the work being performed?

  • What Services are have been identified?

  • Have the services locations and their depth or height (as applicable) also been identified on plans and drawings ?

  • Types of Assets and Limits of Underground Approach

    Approach Distances.png
  • Table of Safe Approach distances

    Asset Dis 2.png
  • Take a photo of the service locations marked on the ground.

  • Are we maintaining the required approach distance to the services

  • Have all redundant Services been marked?

  • Have all associated nearby pits been opened, and checked to identify services?

  • Has an emergency evacuation/rescue plan been developed and in place if the trench is deeper than 1.5m?

  • If the trench is deeper than 1.5 m deep is it battered, benched or shored or inspected by a geotechnical engineer?

  • Has suitable barricading been identified in the SWMS? Is it erected in accordance with SWMS?

  • What type of barricading has been erected?

  • Are there vehicles operating in the area?

  • Have barriers been established to prevent vehicles form entering the zone of influence?

  • Are there controls measures in place to prevent vehicle fumes from entering the trench?

  • Is warning signage displayed in prominent locations?

  • Is the barricading and signage in good condition?

  • Take a photo

  • For trenches deeper than 1.5 meters, is there a means of access/egress every 9 meters?

  • Is the trench spoil located as per the SWMS? (at least equal to depth)

  • Is there materials located within the 'zone of influence'?

  • Are workers required to cross the trench/es?

  • Are properly designed walkways or bridges with guard rails and kickboards provided? Are the trench/es near roadways or paths? Are they open at night? Are there flashing lights / reflective tape to mark the trench/es?

  • If spotters are used for adjacent to services are they positioned in safe location

  • Is the trench/es inspected by a competent person prior to commencing work or after an adverse weather event?

  • Action required?
  • Action

  • Allocated to

  • Action due

  • Evidence of actions

  • Lead Inspector to sign

  • Safety Differently - Anything good from this inspection that should be shared with the teams?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.