Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1. Documentation
-
1.1.1 Is a list of directives, standards and legal requirements used for the machinery safety provided including a declaration of Conformity (if required)?
-
Obtain and review the document provided by the supplier.
-
SELECT
- Design réview
- FAT
- PSSR
-
FAT
-
Design review
-
PSSR
-
1.1.2 Has the supplier provided a document detailing the hazards associated with the equipment, an assessment of the associated risks, and details of the methods used to eliminate or reduce those risks?
-
Obtain and discuss the document with the supplier to ensure all hazards have been identified, eliminated or reduced as much as possible.
-
SELECT
- Design réview
- FAT
- PSSR
-
FAT
-
Design review
-
PSSR
-
1.1.3 Has the supplier provided a document detailing the safeguarding and safety circuit design?
-
Review document for evidence of safety-rated components, tested and certified by nationally recognised testing lab.
-
SELECT
- Design réview
- FAT
- PSSR
-
FAT
-
Design review
-
PSSR
-
1.1.4 Has the supplier provided a document detailing the interventions associated with operating/maintaining the equipment? (eg Operating and Maintenance Manuals)
-
Obtain and discuss the document with the supplier to ensure alignment with Nestlé modes of intervention.
-
SELECT
- Design réview
- FAT
- PSSR
-
FAT
-
Design review
-
PSSR
-
1.1.5 Is Safety, Health, and Environment properly considered in the operating and maintenance intructions?
-
Review the operating and maintenance manuals with the supplier and discuss the intructions.
-
SELECT
- Design réview
- FAT
- PSSR
-
FAT
-
Design review
-
PSSR
-
1.1.6 Is an energy isolation procedure provided?
-
Obtain, review and discuss with the supplier.
-
SELECT
- Design réview
- FAT
- PSSR
-
FAT
-
Design review
-
PSSR
-
1.1.7 Does the maintenance schedule refer to when safety related parts / components of the machine need to be checked, how to be checked and how to be maintained?
-
Obtain and review the maintenance schedule with the supplier.
-
SELECT
- Design réview
- FAT
- PSSR
-
FAT
-
Design review
-
PSSR
2. Risk Reduction
-
SELECT
- Design réview
- FAT
- PSSR
-
FAT
-
Design review
-
PSSR