Title Page
-
Site conducted
-
Project Number
-
Team inspected
-
Conducted on
-
Prepared by
-
Location
Site Inspection (mains)
-
Is breathing apparatus out ready for use and in date?
-
Are fire suits, gauntlets and balaclavas available for all operatives?
-
Are the current works subject to an RO/SRO/NRO?
-
If subject to one of the above procedures is the paperwork available and in date?
-
Has the procedure been authorised and cleared to proceed?
-
Have Network Control been notified by the competent person?
-
Has the pre start been completed and signed
-
Is the competent person on site?
-
Does the procedure mirror site conditions and operations? If not work is to stop as soon as the operation allows and the authorising engineer is to be notified immediately
-
Are any permits to work in place or required?
-
Are permits being adhered to?
-
Are all permits to work signed by all parties and in date?
Mains construction - open cut
-
Is the lay method open cut?
-
If open cut is the depth of cover sufficient?
-
Is the trench width sufficient for the size of main being layed?
-
Are alignment clamps available?
-
Evidence that clamps have been used?
Mains construction - live insertion
-
Is the lay method live insertion?
-
Has the host main been subject to a camera survey?
-
Are all fittings (gland box, end seal, insertion seal etc) in date and in original packaging?
-
Are excavations of a sufficient size to carry out the operation correctly?
-
Is the host main clear of any obstructions?
-
Has the host main been supported? (check there are no joints within the excavation)
Mains Construction - Dead Insertion
-
Is the lay method dead insertion?
-
Are trumpets available to minimise damage to the new main?
-
Is there sufficient clearance to complete the operation?
-
Has a decay test been undertaken?
-
Are alignment clamps available?
-
Evidence that clamps have been used (add photos where possible)
Butt fusion
-
is all plant within date and calibrated
-
Is butt fusion being carried out?
-
Butt fusion carried out correctly and cooling times observed?
PE construction
-
Is all PE pipe stored correctly and free from damage
-
Is electrofusion being carried out?
-
Electrofusion fittings kept in original packaging until point of use?
-
Pipe scraped and clear of contamination?
-
Fusion cycles complete and cooling times observed?
-
Alignment clamps marked and fusion times written on fitting or pipe?
-
EUSR number recorded on fitting or pipe?
-
Is test equipment available / in use?
-
Has flow stop equipment been installed as per SGN work procedure?
-
Have the correct distance between fittings etc been applied?
-
Have squeeze off's been applied to any section of main?
-
Has the pipe been rerounded and tape applied?
-
Has the RO/NRO/SRO been closed with Network Control and the authorising engineer?
Additional comments
-
undefined
Sign off
-
Inspector
-
Time and date