Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Airco
-
Airco1
-
Airco 2
-
Airco 3
-
Airco 4
-
Airco 5
-
Airco 6
-
Airco 7
-
Airco 8
-
Airco 9<br>
-
Airco 10
-
Office
48V Dc A
-
Visual check modules
-
Check battery
-
Check voltage/load
48V Dc B
-
Visual check modules
-
Check battery
-
Check voltage/load
UPS
-
Check battery
-
Ups load A1
-
Ups load A2
-
Ups load A3
-
Ups load B1
-
Ups load B2
-
Ups load B3
Generator
-
Check emergency stop not pressed
-
Check level coolingwater
-
Check air intake
-
Per heating
-
Check battery
-
Check for lose parts
-
Fuel level above 75%
-
Indication lamps /sensing instruments
-
Numer of starts
Electrical equipment
-
Check distribution boards en static switches
-
HVAC room
-
Node
-
Housing
-
Power room1
-
Power room2
-
Power room 3
-
Battery room 1
-
Battery room 2
-
HV room building
-
Visual check sockets
-
Visual check switches
Water leak detection
-
Check if no errors
-
Visual check cabling
FDS
-
Check gas bottles
-
Check if no error
-
check battery
Lighting
-
Emergency lighting
-
HVAC room
-
Node
-
Housing
-
Power room1
-
Power room2
-
Power room 3
-
Battery room 1
-
Battery room 2
-
Lighting
-
HVAC room
-
Node
-
Housing
-
Power room1
-
Power room2
-
Power room 3
-
Battery room 1
-
Battery room 2
General
-
Check locks monthly
-
Check warm water >65 graden
-
Sanitar
-
First aid box
-
Check if site is free of trash
Sign Off
-
On site representative