Please answer the questions and fill out the required information and photographs. Some questions will require further input of information, you will be prompted to add either as a multi choice where either one response or multiple response can be chosen. Some items are mandatory and will require your input or taking of photos.
-
We have attended the Customer/s property and the following type/s of make safe were carried out.
- Roof make safe
- Electrical make safe
- Structural make safe
- Securing of property (boarding up Windows & Doors)
- Removal of Tree
- Restoration
- Asbestos
-
These make safe works were actioned during the following work time:
OUTLINE OF MAKESAFE WORKS ACTIONED
-
Please chose what works were actioned, you must add photographs of works undertaken before and after where possible.
-
The following works were actioned during the make safe.
- Asbestos encapsulation
- Asbestos removal of loose debris.
- Tarp applied to roof.
- Replaced broken tile/s
- Mastic sealed damaged tiles.
- Mastic sealed around flashing and/or roof penetration.
- Boarded up opening/s to secure dwelling.
- Removed debris and/or glass.
- Disconnect and isolated affected circuits.
- Propping of affected structural elements.
- Water extraction
- Mould treatment and removal.
Add make safe description if not in list.
-
The following make safe works were actioned
-
Please add at least 3 photographs, one should be a font elevation picture, please add description. You an add more than one photograph for each item by tapping the media button after each photo.
-
Add media
-
Description of photographs location.
-
Add media
-
Description of photographs location.
-
Add media
-
Description of photographs location.
-
The cause of the damage is from:
-
Is the property safe for occupants?
-
The following issues are preventing the home owner from occupying the home.
Expenditures and times
MAKESAFE SAFE COSTS.
-
Please add your labour and materials costs expended on the make safe. If you know you will need to re attend to either remove tarps or structural support props etc, please ensure you include for your time for this revisit. You will need to submit your invoice also for payment as soon as practical. All costs added here should not include gst.
-
Please be advised where an item such as a prop or tarp is supplied you are to include for the full cost of the item supply if the period of use exceeds the replacement cost value of the item.
Material costs.
-
Add material item.
-
Item description.
-
Number used
-
Total cost of item supply.
Labour supply
-
Add trade type.
-
Trade type.
- Labourer
- Carpenter
- Roofer
- Electrician
- Plumber
- Bricklayer
- General Builder
- Tree Surgeon.
-
Name of operative
-
Total hours expended.
-
Cost per hour
-
Total cost for operative.
Signature of supervisor
-
By signing you have agreed the cost submitted are the costs that will be invoiced plus any applicable taxes.
-