Title Page
-
Job No.
-
Customer
-
Contact Name
-
Contact Number
-
Job Address
-
Start Date
-
Time Allocated
-
Scoped By
-
Squad Leader
-
Brief description of work to be carried out / Method Statement
-
Over 5 Day Site Pack Required
-
PART A B C must be completed prior to commencement of works
Part A
-
Site Access & Issues (Include for operatives, plant and materials)
-
Any Scaffold / Edge Protection (Work at gable ends?)
-
Site Security
-
Material Storage, Delivery and Security
-
Material Lifting Equipment (Consider access, overhead cables, underground services etc.)
-
Material Waste Needs (By G.R. or Main Contractor, Recycle where possible)
-
Site Welfare Location and Needs
-
Permits Required
- Skip
- Scaffolding
- Parking Bay Closure
- Road/Lane Closure
- Street Lighting
-
Follow Sections to assess type of work and risk assessment / method statement required.
Part B
Section A Property Type & Arrival Procedures
-
Section A Risk Assessment Ref
-
Describe Type of Property and access point
Section B Access to work area
-
Section B Risk Assessment Ref
-
Means of access to work area and assessed method. Include for Main Contractor induction process / sign in procedure
Section C Fall prevention
-
Section C Risk Assessment Ref
-
Fall prevention measures and assessed method of use
Section D Task related risk assessments
-
Section D Risk Assessment Ref
-
List the generic assessments applicable and add site specific details
Section E Key materials for job
-
Section E Risk Assessment Ref
-
Info on COSHH, lifting process, manual handling, delivery route List the generic assessments applicable and add site specific details
Section F Tools & Equipment
-
Section F Risk Assessment Ref
-
List the generic assessments applicable and add site specific details
Section G Other Persons or property at risk
-
Section G Risk Assessment Ref
-
Persons and property at risk and protection method LIST the generic assessments applicable and add site specific details include any requirements for gas flue checks and vents
Environmental Requirements
-
Protected species, asbestos survey required, SSSI site in vicinity, waterways etc.
-
Rough diagram & additional notes
-
Any other hazards and risk not covered should be assessed on additional risk assessment form and attach.(take picture)
-
UNDER NO CIRCUMSTANCES SHOULD UNCONTROLLED TASKS BE TACKLED!
Part C
-
A. Does squad leader have relevant qualifications to take charge of job
-
What additional measures have been put in place List Sub Contractors to be used
-
B. Will sub contractors be used for job
Emergency Procedures:
-
In the event of failure of control measures, Emergency services must be called (999) in the first instance.
This should not be delayed by any means especially where safety harness failure has occurred and operative is in a state of suspension.
Operatives must ensure they are familiar with site address details
Supervisor must be called after emergency services.
Only where possible assist in rescue, do not risk further danger.
In event of accident that needs treatment, call appointed person immediately, where possible drive casualty to ACCIDENT AND EMERGENCY or call ambulance.
Site Specific Rules:
First Aid Facilities:
-
First Aid Box Location:
-
Location of Nearest A&E Hospital:
PPE Requirements
-
select PPE requirements
- Hard Hat
- safety Glasses
- Hi-Viz
- Ear Defenders
- Gloves
- Overalls
- Safety Boots
- Harness/Lanyard
Chain of ownership
-
Manager
-
Health And Safety Manager