Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Untitled Page
-
Project Details
-
Client
-
Site
-
Project Name
-
Contractor
-
Audit Details
-
Inspection Date
-
Audited By
-
Audit Score
-
Work Description / Summary
-
Summary
-
How many items within this report exceed legal requirements?
-
CDM2015 (Documents, Induction, Competency)
-
Protecting People from Site Activities
-
Welfare, Storage and Laydown Areas
-
CDM2015 (Documents, Induction, Competency)
-
Protecting People from Site Activities
-
Welfare, Storage and Laydown Areas
-
CDM2015 (Documents, Induction, Competency)
-
Is the form F10 on display?
-
Is it up to dates and are the details correct?
-
Is the Construction Phase Plan up-to-date and being adhered to?
-
Have the site team completed an induction?
-
Is a suitably competent site supervisor / manager present on site? e.g. SMSTS / SSSTS
-
Are persons competent to carry out the work / tasks they are undertaking?
-
Have competency records been checked? e.g. CSCS, IPAF, PASMA, etc.
-
Are the works adequately segregated from the public?
-
Has safe access to all working areas been provided? Hard to reach areas, deliveries, etc.
-
Has the appropriate access equipment been provided if required?
-
Is the site clean and tidy?
-
Is the working area / access adequately lit?
-
Is there sufficient task lighting where required?
-
Are there adequate rest, changing and toilet facilities for the number of persons on site, type of work activities and duration of works?
-
Are there sufficient storage facilities and laydown areas?
-
Fire, First Aid and Emergency Procedures
-
- Is this section applicable? (yes|no|not-applicable)
-
- Is there a system in place for establishing who is on site?
-
- Is there sufficient first aid provision for the numbers on site, type of works and potential injuries?
-
- Is first aid equipment accessible?
-
- Is there a means of raising the alarm and notifying workers? Including operatives working on roofs, mast climbers and scaffold etc.
-
- Has a drill been carried out and procedures tested? Covering all areas of the site / working areas?
-
- Are there adequate escape routes and are they kept clear?
-
- Is waste, flammable materials and open skips located away from the site boundary and secured to deter / prevent arson?
-
- Are flammables stored safely and appropriately?
-
Appropriate exclusion zone and barriers - 2 fire extinguishers - Fire watch
-
RAMS and PPE
-
- Is this section applicable? (yes|no|not-applicable)
-
- Have suitable and sufficient Risk Assessments been carried out and are they available?
-
- Do they identify the significant hazards associated with the works / site and suitable control measures?
-
- Is there evidence that Risk Assessments are communicated to contractors and understood prior to works commencing?
-
- Are works being carried out in accordance with the RAMS?
-
- Has adequate PPE been provided and is the equipment in the appropriate condition?
-
Is the wearing of PPE as identified by risk assessments / COSHH assessments enforced?
-
Is this section applicable?
-
Is this section applicable?
-
If working on the roof, has a competent person confirmed no fragile surfaces or confirmed safe routes?
-
Is there adequate protection to prevent falls of persons / objects? e.g. edge protection, debris netting, exclusion zones
-
Are the control measures appropriate and suitable and sufficient?
-
Is the working at height access equipment appropriate to the nature of the work to be performed and the foreseeable loadings?
-
Is the equipment in good condition?
-
Is this section applicable?
-
Have towers been erected by a competent / suitably trained person? e.g. PASMA
-
Are all scaffolds erected and altered by a certified competent person? e.g. NASC Trained
-
Are towers resting on firm, level ground with the locked castors or base plates properly supported?
-
Are materials evenly distributed and platforms clean and free from debris?
-
Are guard rails, toe boards and other barriers provided sufficient to prevent a person or objects falling from height?
-
Are there suitable measures in place to prevent and deter unauthorized access to the scaffold?
-
Is there evidence that scaffold and towers have been inspected before first use and every 7 days?
-
Is this section applicable?
-
Are all dangerous parts guarded?
-
Is the equipment being used in a safe manner, with appropriate control measures in place?
-
Does the equipment / plant have a current inspection / test certificate?
-
Is the equipment, machinery in good condition and secured when not in use?
-
Is the MEWP appropriate to the nature of the work to be performed and the foreseeable loadings?
-
Are vehicles kept clear of pedestrians?
-
Are vehicles kept clear of pedestrians at:
-
- Site entrances
-
- Doors or gates loading / unloading areas
-
- Parking and maneuvering places
-
- Areas where drivers' vision may be obstructed
-
Is this section applicable?
-
Are trip devices / RCD's used where mains voltage used?
-
Are cables and leads in good condition?
-
Are trailing cables protected / routed to prevent damage?
-
Are electrical appliances and equipment maintained in good condition?
-
Are they inspected and tested by a competent person as per the contractor's testing regime?
-
Is a safe isolation and LOTO procedure in place / being adhered to?
-
Is this section applicable?
-
AtkinsRéalis - Health & Safety Audit Report - Private & confidential
-
With regards to the dismantling, have all services been identified and safely isolated, terminated or disconnected as required?
-
Are certificates of disconnection available for disconnected services?
-
Have appropriate / suitable exclusion zones been established and implemented?
-
Is this section applicable?
-
Is an asbestos report available and does it cover all areas within the scope of works?
-
Is the asbestos management procedure in place?
-
Is it being adhered to?
-
Are they working safely and in accordance with the management procedure and risk assessment?
-
Is the management procedure and location / type of any known asbestos communicated to the site team during the induction and RAMS Briefing?
-
Is this section applicable?
-
Have all harmful substances been identified and assessments carried out?
-
Are the COSHH Assessments and SDS accessible?
-
Are the hazards and controls communicated to operatives? e.g. RAMS briefing, induction etc.
-
Is there appropriate storage for substances?
-
Are Hazardous Substance containers correctly labelled?
-
Are suitable control measures being implemented to mitigate exposure to hazardous substances? e.g. dust, fumes
-
Is this section applicable?
-
yes
-
Have potentially noisy operations been identified and suitable assessment of the risks carried out?
-
Are noise measurements being carried out, recorded and reviewed?
-
Are the identified control measures being adhered to?
-
Is hearing protection being worn?
-
Exclusion zones been adhered to?
-
Are any potential exposure to guano, mould, radon etc. been suitably controlled and where applicable?
-
Are decontamination procedures in place?
-
Have all work activities liable to expose to workers to vibrations, been assessed and appropriate control measures identified?
-
Have the RAMS taken into consideration transporting materials, tools and waste around site? Including size and weight of materials, environment and terrain.
-
Where feasible to do so, are alternative mechanical means utilised?
-
Is manual handling carried out safely?
-
If fuels / oils are stored on site, are there suitable measures to contain the spill?
-
Are waste transfer notes / hazardous waste transfer notes completed and records retained?
-
Is waste kept in approved / secure containers?
-
Is incompatible waste segregated?
-
Are other hazards not listed, sufficiently mitigated / controlled?
-
Are other hazards not listed, sufficiently mitigated / controlled?
-
Safety Observations - Client Initiative
-
Is this section applicable?
-
Are the site team aware of 'Safety Observations'?
-
Is there an established method for raising and recording 'Safety Observations'?
-
Previous Audit Observations and Close-out
-
Is this section applicable?
-
Have all observations raised during the previous site H&S audit been satisfactorily addressed?
-
Sign Off
-
Auditor Signature
-
Site Manager Signature
-
8/8