Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Introduction
-
Client
-
Site/Contract Address
-
Project Number
-
What activity is being carried out at the time of visit?
-
List the names of the operatives on site at the time of audit
Site Entry and Access
-
Is parking suitable and close enough to the work area
-
Is access to and from the work area clear and free from hazards
-
Is there a safe route to move / carry tools and equipment to the work area?
-
Can a safe route / method be agreed?
-
Is the work area tidy, well managed and controlled
Site Management
-
Is there a signing in book
-
Have all of our our team (inc sub contractors) signed in (and out previously)
-
Have all of our team had a site induction
-
Has a site / specific set of RAMS been written / issued for the work?
-
Has the POW RA been undertaken correctly on SimPro, does it include sufficient detail?
-
How can we demonstrate that task / activity is being managed safely?
-
Have our RAMS / Plan of work been signed by all team members (take photo)
-
Have all Shield engineers carried out a pre audit on SimPro
-
Is a Permit to work required for any activities?
-
What type of permit
PPE
-
All our team members wearing the correct PPE for the site and the tasks they are doing
-
Is the PPE in good condition
Tools and Equipment
-
Do the team members have the tools that are stated in the RAMS
-
Is the equipment in good serviceable condition
-
Is equipment with mains cables (including extension leads) tested and labelled to demonstrate
-
Are tools being used for their intended purpose and not being misused
Working at Height
-
Do any of the tasks involve working at any height from the floor or below ground
-
Is the correct equipment, as per the plan of works being used (please check from the list)
-
Is the equipment in good condition and tested as required
-
Are all users of work at height equipment competent
Quality
-
Has a drawing or diagram been issued to the engineer to assist with the installation (attach a phot)
-
How did the engineer know the correct way to install? Record response
-
Is the workmanship of a good acceptable quality
-
Is the finished product acceptable
-
Are completed areas left in a clean and tidy condition
-
Has the customer complimented Shield's quality of work or service
-
Has the customer complained about Shield's quality of work or service
Sign Off
-
Auditor
-
Auditee