Title Page
-
Conducted on
-
Prepared by
-
Location
Introduction
-
Client
-
Site/Contract Address
-
Project Number
Site Entry and Access
-
Is parking suitable and close enough to the work area
-
Is access to and from the work area clear and free from hazards
-
Is the work area tidy, well managed and controlled
Site Management
-
Is there a signing in book
-
Have all of our our team (inc sub contractors) signed in (and out previously)
-
Have all of our team had a site induction
-
Have our RAMS / Plan of work been signed by all team members
-
Have all Shield engineers carried out a pre audit on SimPro
PPE
-
All our team members wearing the correct PPE for the site and the tasks they are doing
-
Is the PPE in good condition
Tools and Equipment
-
Do the team members have the tools that are stated in the RAMS
-
Is the equipment in good serviceable condition
-
Is equipment with mains cables (including extension leads) tested and labelled to demonstrate
-
Are tools being used for their intended purpose and not being misused
Working at Height
-
Do any of the tasks involve working at any height from the floor
-
Is the correct equipment, as per the plan of works being used (please check from the list)
-
Is the equipment in good condition and tested as required
-
Are all used of work at height equipment competent
Quality
-
Is the workmanship of a good acceptable quality
-
Is the finished product acceptable
-
Are completed areas left in a clean and tidy condition
-
Has the customer complimented or complained about Shield's quality
Sign Off
-
Auditor
-
Auditee