Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Job Details
-
Job Address
-
Customer, Contact Name and Number
-
Time Allocated
-
Description of Works
-
Over 5 day pack required?
-
Access Requirements (include fall prevention measures)
-
Security Required
-
Delivery and Storage Requirements
-
Loading Requirements (consider access, overhead cables, underground services etc)
-
Waste requirements (skips on site, licensed contractor, Graham Roofing yard?)
-
Welfare Needs and Location
-
Permit Requirements (skips, scaffold, parking bays, road closure, street lighting, others
-
Environmental Aspects (check for birds, bats, proximity to waterways, SSSIs, asbestos survey required?)
Risk Assessment / Method Statement Requirements
-
Property Type and Arrival Procedures (include for induction process / sign in procedures)
-
Access To Work Area (scaffold, cherry picker, internal access etc)
-
Fall Prevention
-
Task Related Risk Assessments (add site specific requirements)
-
Key Materials (info on COSHH requirements, lead etc)
-
Tools and Equipment
-
Other People / Property at Risk
-
Environmental Requirements (surveys required, specific spill requirements)
-
Additional Information
Additional Requirements
-
Squad leader / site supervision requirements
-
Subcontractors
-
First Aid Requirements / Nearest Hospital
-
Any specific PPE or other requirements