Title Page
-
Site conducted
-
Area conducted
- PVC
- Glass
- PCW
- Panel Shop
- Composites
- Old Glass Factory
- Stores
-
FSR - Working At Height
-
Conducted on
-
Observers
-
Location - (Description or Cell number)
Documentation
-
<br>Are the Training Records of the Operator available and within date?
-
Stop process immediately & Raise to area PL
-
<br>Have all Kamishibai Checks been completed for area?
-
<br>Is the Activities Risk Assessment in Date and Available?
-
Raise to area PL & Action to update on accountability tracker
Critical Controls
-
Is appropriate access equipment being used?
-
Stop process immediately and raise to relevant manager
-
Is access equipment powered?
-
Are pre-use inspections complete and readily available?
-
Raise with relevant dept manager and raise internal NCR
-
Document NCR number
-
On platforms are guard rails and toe-boards in place that prevent or reduce potential for injury?
-
Raise with relevant dept manager and raise internal NCR
-
Document NCR number
-
Is access equipment free from damage?
-
Stop process immediately and raise to relevant manager
-
Is access equipment tagged and in date?
-
Stop process immediately and raise to relevant manager
-
Is relevant PPE being used whilst working at height task is being completed?
-
Stop process immediately and raise to relevant manager
-
Are harnesses being worn where required (roof/platform work)?
-
Raise with relevant dept manager and raise internal NCR
-
Document NCR Number
Process Controls
-
Are all activities carried out in accordance to risk assessment and safe system of work?
-
Risk Assessment Number or SSW number
-
Stop process immediately and raise to relevant manager
Achievement of intended outcome
-
Based on the outcome of this audit, do you consider this activity to be controlled effectively to remove/reduce any fatal/severe risk to any person(s)?
-
Give evidence
Sign Off
-
Signature
-
Date and Time of signature