Title Page

  • Conducted on

  • Depot

  • Prepared by

  • Location
  • Contract number

  • Customer name

  • Installation date

  • Installation team

Customer

  • Is the customer available and are you able to access the property?

Approved Document A - Structure

Lintels

  • Are lintels clearly visible?

  • Are the lintels in good condition and is the wall directly above the aperture free from cracks and deformation?

Fixings

  • fixing distances.PNG
  • Are fixings between 150mm and 250mm from the external corners?

  • Are any fixings greater than 600mm (centres) apart?

  • Are any fixings less than 150mm from the centre line of the transoms/mullions?

Bay Windows

  • Have any load-bearing frames or bay windows been installed in the property?

  • Has a load bearing jacking kit been installed?

  • Have spreader plates been installed to the head?

Approved Document C - Site preparation and resistance to contaminants and moisture

  • Is there a sill?

  • Have the frames been bedded down to the external sill?

  • Are the external sills bedded on silicone?

  • Have the sills been bedded between the external sill and the brickwork? (Please check the underside)

  • Has expanding foam been used?

  • Has the perimeter of the frame been adequately sealed? (6mm frame cover)

  • Have brick horns been made good? (where applicable)

Approved Document 7: Materials and workmanship

  • Are there any damaged items?

  • Are there any product issues on the frame welds, gearing or handles?

  • Product issues

  • Is the silicone work neat and tidy?

  • Is there any work that is outstanding?

  • Has the site been left clean and tidy in a satisfactory state?

  • Is there any scaffolding awaiting removal?

  • Are there any customer concerns?

  • Please state the customer concerns in detail

  • Customer comments

  • Other comments

Regulations 7 - Materials and Workmanship

  • Has the site been left clean and tidy in an acceptable state?

  • Is the silicone work neat and tidy?

  • Are there any visible product issues on the frame welds, gearing or handles?

  • Please select the product issue(s)

  • Please provide a photo of the concerned items/areas

Approved Document C - Site preparation and resistance to contaminants and moisture

  • Is there a sill?

  • Have the frames been bedded down to the external sill?

  • Are the external sills bedded on silicone?

  • Have the sills been bedded between the external sill and the brickwork? (Please check the underside)

  • Has the perimeter of the frame been adequately sealed? (6mm frame cover)

  • Have brick horns been made good?

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.