Title Page
-
Conducted on
-
Depot
-
Prepared by
-
Location
-
Contract number
-
Customer name
-
Installation date
-
Installation team
Customer
-
Is the customer available and are you able to access the property?
Approved Document A - Structure
Lintels
-
Are lintels clearly visible?
-
Are the lintels in good condition and is the wall directly above the aperture free from cracks and deformation?
Fixings
-
Are fixings between 150mm and 250mm from the external corners?
-
Are any fixings greater than 600mm (centres) apart?
-
Are any fixings less than 150mm from the centre line of the transoms/mullions?
Bay Windows
-
Have any load-bearing frames or bay windows been installed in the property?
-
Has a load bearing jacking kit been installed?
-
Have spreader plates been installed to the head?
Approved Document C - Site preparation and resistance to contaminants and moisture
-
Is there a sill?
-
Have the frames been bedded down to the external sill?
-
Are the external sills bedded on silicone?
-
Have the sills been bedded between the external sill and the brickwork? (Please check the underside)
-
Has expanding foam been used?
-
Has the perimeter of the frame been adequately sealed? (6mm frame cover)
-
Have brick horns been made good? (where applicable)
Approved Document 7: Materials and workmanship
-
Are there any damaged items?
-
Are there any product issues on the frame welds, gearing or handles?
-
Product issues
- Frame welds
- Gearing
- Handles
- Double Glazed Units
-
Is the silicone work neat and tidy?
-
Is there any work that is outstanding?
-
Has the site been left clean and tidy in a satisfactory state?
-
Is there any scaffolding awaiting removal?
-
Are there any customer concerns?
-
Please state the customer concerns in detail
-
Customer comments
-
Other comments
Regulations 7 - Materials and Workmanship
-
Has the site been left clean and tidy in an acceptable state?
-
Is the silicone work neat and tidy?
-
Are there any visible product issues on the frame welds, gearing or handles?
-
Please select the product issue(s)
- Frame welds
- Gearing
- Handles
- Double Glazed Units
-
Please provide a photo of the concerned items/areas
Approved Document C - Site preparation and resistance to contaminants and moisture
-
Is there a sill?
-
Have the frames been bedded down to the external sill?
-
Are the external sills bedded on silicone?
-
Have the sills been bedded between the external sill and the brickwork? (Please check the underside)
-
Has the perimeter of the frame been adequately sealed? (6mm frame cover)
-
Have brick horns been made good?
-
Signature