Information
-
Masonry QC Inspection
-
Conducted on
-
Prepared by
-
Stainless steel reinforcement with pintels at exterior walls.
-
Hot dipped (galvanized) joint reinforcement at interior walls.
-
T- and corner reinforcement where there are intersections.
-
Two courses of Durawall above and below all openings.
-
Verify rebar locations and sizes.
-
Verify embed plate locations and elevations.
-
Open face shells at T-intersections.
-
Horizontal bond beam grout stops.
-
Verify correct mortar and grout.
-
Verify mortar consistency.
-
Verify grout consistency.
-
Consolidation of grout when placing.
-
Mortar joints are consistent and aligned.
-
Verify alignment of soldier course joints.
-
Verify elevations of walls and openings.
-
MEP openings and penetrations are in place.
-
Maintain 3/8" around door jambs.
-
Doors are plumb, level and square.
-
Windows are plumb and level.
-
Bolts installed for guard rails
-
Enter name of Inspector
-
Enter name of secondary inspector
-
Enter name of masonry foreman. This is to acknowledge that the above statements are true and if any discrepancies exist, corrections will be made as soon as possible.