Information
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
REPORT NO.
1.0 - MATERIAL RECEIVED
-
1.1 Description
-
1.2 Quantity
-
1.3 Submittal Reference No.
-
1.4 Supplier / Manufacturer
-
1.5 Purchase Order Reference No.
-
1.6 Is Material order complete?
MATERIAL RECEIVED PHOTOS
-
Add photo here
-
Add photo here
-
Add photo here
2.0 - RECEIVING INSPECTION REQUIREMENTS
-
2.1 Material complies with contractural requirements
-
2.2 Physical Condition of Material
-
2.3 Packaging
-
2.4 Identification/Marking as required per specifications
5.0 - SIGNATURES
-
OWNER / OWNER REPRESENTATIVE
-
Enter Date and Time