Title Page

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • The following occupational health and safety (OHS) audit provides an indication of the conditions and practices that were occurring at the time of the assessment and recommendations to improve compliance with State OHS legislation. It should be noted that an audit of this nature represents a ‘snapshot’ in time and that because of this, not all potential hazards and health risks may be identified, only those present at the time of assessment.

OHS Coordination Plan

Health & Safety Coordination Plan

  • Has the workplace prepared a health and safety coordination plan

  • Does the health and safety coordination plan outline (a) names, positions and specific responsibilities for health and safety (b) arrangements for managing incidents and (c) site safety rules

  • Is the plan posted in a prominent location

Safe Work Method Statments (SWMS)

Safe Work Method Statements (SWMS)

  • Have Safe Work Method Statements been prepared for high risk construction work before the work commenced

  • SWMS review
  • Subcontractor

  • Document title / reference

  • Is the safe work method statement project specific (include a project name and / or address, dated, signed by the appropriate workers)

  • Site specific (include a project name and / or address)

  • Dated

  • Signed by workers performing the task

  • Have hazards associated with the construction work been identified in the SWMS

  • Does the SWMS sufficiently describe measures to control those risks

  • Have the risk controls (SWMS) of the high risk construction work been reviewed:<br>Before any change is made to the way the construction work is performed<br>If new or additional information about hazards relating to the construction work becomes available to the employer<br>Following an incident occuring during high risk construction work

Site Establishment

Site Establishment

  • Is the ‘If you are injured at work’ poster displayed in a prominent location in the workplace

  • Safety signs are installed warning of the dangers and outlining required personal protective equipment

  • Toilets and washing facilities are provided and are adequate and clean

  • Meal / dining area is provided which is adequate and clean

Emergency Management

Emergency Management

  • Has an emergency evacuation procedure been developed and implemented in the workplace

  • There is a process to alert workers and raise the alarm during an emergency

  • Contact information and location of nearest medical centre / hospital is displayed

  • Evacuation diagrams are placed in prominent locations

  • There is a designated assembly area clearly identifiable with the appropriate signage

  • Are fire extinguishers readily available on site and placed in an appropriate location

  • Fire extinguishers have been tested and tagged within the last six months

  • Is there a register of injuries available on site

  • Is there a first aid kit available in the workplace

  • Is it free of medication and contain the appropriate amount of stock within its best before date

  • Are there suitably qualified (level 2) persons available to administer first aid in the workplace

Consultation

Consultation

  • Are toolbox meetings being held

  • Is the content of the toolbox sessions site specific, also including OHS that is general in nature (matters that affect workers’ safety)?

  • Site specific

  • OHS discussion is general in nature

  • Are there documented notes (evidence) of toolbox meetings which include dates, items covered, and persons who attended

  • Are minutes of the toolbox meetings available to all site employees / Has OHS information been posted on the site notice board

  • Is safety ‘on the agenda’ at least once a month

Prevention of Falls

Prevention of Falls

  • Prevention of Falls

  • Are ladders in use appropriate for the task

  • Are guardrails installed in accordance with the manufacturers specifications

  • Is there scaffolding on the site

  • Was a handover certificate provided once installation was completed

  • Are inspections completed at least every 30 days and whenever alterations are made

  • Is there safe access to every scaffold platform (properly constructed temporary stairway or ladder access is securely fixed to prevent movement, ladders pitched at a gradient not less than 1 in 4 and extend at least 900 mm above the platform)

  • Platforms higher than 2 metres have guardrails, midrails and toeboards fixed to each open side and end

  • Is the scaffold strong enough for the loads

  • Is the scaffold stable (may include timber soleplates, braced or tied to the supporting structure, level)

Hazardous Substances and Dangerous Goods (HSDG)

Hazardous Substances and Dangerous Goods (HSDG)

  • Hazardous Substances and Dangerous Goods (HSDG)

  • Are Material Safety Data Sheets (MSDS) available for HSDG on site

  • Has an MSDS register been implemented and maintained

  • Are HSDG safely stored and appropriately labelled

  • Are gas cylinders secured to a trolley or structure to prevent them from being knocked over

  • Are mechanisms in place for containment of spills

Plant

Plant

  • Plant

  • Are records of plant induction available

  • Service and maintenance records

  • Operators manual

  • Daily log book

  • Condition of plant

  • Is a plant induction register maintained for the site

  • Is there evidence that pre-start checks are being completed

  • Is work in the area of powered mobile plant being performed in accordance with a SWMS

  • Have overhead and underground services been identified

Electrical

Electrical Safety

  • Electrical Safety

  • Switchboards in use on site

  • Temporary powerboard and RCD’s (incl. PSOA) tested at least every 30 days

  • Lockable cover on RCD at switchboard

  • Securely attached to a pole, post, wall or other free-standing structure designed to withstand external forces (e.g. from flexible cords)

  • An opening at the bottom to allow flexible cords to pass through without damage

  • Signs stating "KEEP CLOSED - RUN LEADS THROUGH BOTTOM"

  • Portable equipment or flexible cords in use

  • Portable equipment and leads tested and tagged 3 monthly

  • Flexible cords are raised off the ground using insulated hangers or stands

  • Flexible cords are protected from mechanical damage, damage by liquids or high temperatures

  • ESV Certificates of electrical safety have been provided for any alterations, additions, modifications and repairs to construction wiring or fixed electrical installations

  • Construction wiring is readily identifiable (e.g. different colour, yellow tape labelled "construction wiring" every 5 metres)

Traffic Management

Traffic Management

  • Traffic Management

  • Is a Traffic Management Plan in place and has it been implemented in accordance with the plan and by a competent person?

  • Do traffic controllers hold Vicroads approved competency

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.