This procedure applies when changing over existing or installing a new switchboard

Do you have all PPE required?

  • Steel capped boots

  • Hi-vis clothing

  • Safety glasses (when required)

Hazards

  • Electric shock

Control Measures

  • Isolate and test

Procedure

  • 1. Isolate
    2. Mark all cables
    3. Disconnect
    4. Remove old switchboard
    5. Install new switchboard
    6. Connect
    7. Test
    8. De-Isolate
    9. Test polarity & RCD's

Notes

  • Notes or other hazards identified:

  • Photos if needed

  • I have reviewed this Standard Operating Procedure and agree with the hazards identified and agree to adhere to the procedure

  • Name of signee(s)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.