Information
-
Job Number
-
Client / Site
-
Conducted on
-
Prepared by
-
Personnel
Scope: This procedure applies when wiring all new houses or sheds
Do you have all PPE Required?
-
Steel capped boots
-
Hi-vis clothing
-
Dust mask if required
-
Hearing protection if required
-
Safety glasses if requried
Hazards
-
Working at heights (ladders & scaffold)
-
Cuts & scrapes from nails & sharp brackets
-
Slips, trips & falls from leads or untidy work area
-
Use of power tools - electrocution & trips
-
Manual handling of large drums of cable
Control Measures
-
Ensure ladders & scaffold are in good condition
-
Ensure ladders & scaffold have level footing
-
Take care when mailing & drilling
-
Watch out for builders brackets & nails
-
Keep work area tidy
-
Be aware of other tradesmen on site
-
Use manual handling techniques when lifting drums of cable
Procedure
-
1. Keep work area tidy
2. Nail on stud brackets & drill holes
3. Set cable drums on roller and calculate cable route
4. Run cables as required by customer and at AS3000 standards
5. Tape all cable ends up
6. Ensure all cables are at correct points & mark with permanent marker
7. Complete fit out sheet
8. Pack up all cables & tools and clean area
9. Complete jobtracker, including all materials
10. Tidy work area
Notes
-
Notes or other hazards identified:
-
Photos if needed
-
I have reviewed this Standard Operating Procedure and agree with the hazards identified and agree to adhere to the procedure
-
Name of Signee(s):
-
Signatures: