Information
-
Job Number
-
Client / Site
-
Conducted on
-
Prepared by
-
Personnel
This procedure applies when re-wiring all houses or sheds
Do you have all the PPE required?
-
Steel capped boots
-
Hi-vis clothing
-
Mask (when required)
-
Safety glasses (when required)
-
Hearing protection (when required)
Hazards
-
Working at heights (ladders & scaffold
-
Cuts & scrapes from nails & sharp brackets
-
Slips, trips & falls from leads or untidy work area
-
Use of power tools - electrocution & trips
-
Manual handling of large drums of cable
Control Measures
-
Ensure ladders & scaffold are in good condition
-
Ensure ladders & scaffold have level footing
-
Take care when nailing & drilling
-
Watch out for builders brackets & nails
-
Keep work area tidy
-
Be aware of other tradesmen on site
-
Use manual handling techniques when lifting drums of cable
Procedure
-
1. Isolate all existing electrical items (Follow MCW050 procedure)
2. Remove all old fittings / cable – make redundant
3. Nail stud brackets on studs where required
4. Determine new lighting points (discuss with customer)
5. Install cable for new electrical items e.g. GPO & lights
6. Mark all lights out on plan
7. Ensure house us safe to re-energize
8. Complete fit out sheet
9. Pack up all cable and tools
10. Tidy working area
11. Complete jobsheets including recording all materials used
Notes
-
Notes or other hazards identified:
-
Photos if needed
-
I have reviewed this Standard Operating Procedure and agree with the hazards identified and agree to adhere to the procedure:
-
Name of signee(s):
-
Select date