Work Activities Conducted on Site
-
- Excavation activities
- Confined space entry
- Floating cover installation
- Pipe relining works
- Earthworks
- Pipeline installation
- Structural works
- Working on over or near water
- Traffic management
- Electrical/Instrumentation commissioning
- Pump installations/removal
- Hydro excavation
- Dredging works
- Valve/Penstock installation works
- Building refurbishment works
- Roadworks
- Welding activities
- Crane activities
- Road construction
- Electrical/Instrumentation commissioning
- Mechanical commissioning
- Concrete placement
- Working at height
- Roofing works
- Mechanical works
- Electrical/Instrumentation works
- Environmental works
-
Other site activity not noted on the pick list:
Discussions with Site Workers
-
Tell me about the works on site ?
- Comprehensive understanding
- Understanding of specific tasks only
- Works under direction only
- Low level of understanding
-
What's your companies safety approach and beliefs ?
-
What sort of documentation do you have for working safely on site ?
- SWMS
- Procedures
- Workpacks
- AMS
- Work Permits
-
Are there any site specific requirements related to the work you are doing at present including MW requirements, if so what are they ?
-
Do you attend Toolbox meetings ?
- You are comfortable you can have your say
- Relevant topics are discussed
- Items raised at the TB meetings turn into actions where possible
-
Other comments:
-
What sort of incidents get reported ?
- First Aid
- Medical Treatment
- Lost Time Injuries
- Near Miss
- High Potential Incidents
- Environmental Incidents
- Plant/Property
-
Does your Emergency Evacuation process work ?
Work Environment and Conditions
-
Housekeeping and Layout:
-
Barricades and Signage:
-
Security of equipment:
-
Environmental controls reviewed:
- Sedimentation controls fences/ bags/matts
- Noise/Dust controls
- Flora and fauna controls
- Vibration controls
- Cultural heritage requirements
- Waste management controls
- Stockpiling controls
- Soil disposal tracking
- Hazardous substances used and stored correctly with MSDS available ?
-
Other controls not noted on the pick list:
-
Environmental controls adequate ?
Systems/Standards/Procedures
-
Competence for task:
- Certificates of Competency recorded
- Verification of Competency undertaken
- Records not available
-
Other comment:
-
Lock-out and Tag-out:
-
Work Permits required/used on site:
- Melbourne Water Permit for works
- Trenching Permit
- Confirmed Space Entry Permit
- Council Approvals
- EPA
- Worksafe Notification for Excavation
SWMS - Pre Start Checks
-
Pre Start Records:
- Attended by all staff
- Records available
- Discussion covers daily activities
-
SWMS Available:
-
SWMS Adequate:
-
SWMS Understood:
-
SWMS Followed:
Tools and Equipment
-
Availability:
-
Condition:
People and Behaviours
-
Are employees ensuring they are not placing themselves in Line of Fire ?
-
Are employees selecting appropriate Tools and Equipment and wearing correct PPE ?
-
Are employees keeping Eyes on Hands whilst doing works which could result in injury ?
-
Are employees Looking Before Moving ?
-
Are employees Communicating their intent to others ?
-
Are employees using correct manual handling techniques to maintain correct Position and Effort ?
-
Are employees Assessing and Re-assessing the area ?
-
Are employees maintaining Eyes on Path whilst moving around the worksite ?
Protection systems
-
Is electrical equipment positioned appropriately with current test and tag ?
-
Are fire extinguishers positioned correctly with clear access and in test and tag ?
-
Scaffold systems inspected and tagged ?
High Risk Activities
-
Are Trenching activities being carried out in accordance with legislative requirements ?
-
Are Confined Space Entries being carried out in accordance with MW procedural requirements ?
-
Are activities being carried out On, Over or Near Water being undertaken in a safe manner ?
-
Are employees using appropriate controls for ascending and descending to and from work areas >2mt
-
Are required controls in place for HV activities ?
-
Are required controls in place for Crane/Lifting activities
ADDITIONAL POSITIVE OBSERVATIONS
-
Note Positive Observations:
-
Photos to support observations:
ADDITIONAL OPPORTUNITIES FOR IMPROVEMENT
-
Note opportunities for improvement:
-
Photos to support identified opportunities for improvement:
-
Provide a sketch of the area of concern if applicable to support findings:
Other Comments
-
Note other comments here: