Information

  • Site conducted

  • Document No.

  • Client

  • Site Name

  • Conducted on

  • Engineer

  • Site Address
  • Test & Inspection carried out in accordance with BS5839-1:2013

1.0 Panel Details

  • 1.1 Panel Type

  • 1.2 Panel Manufacture

  • 1.3 Loops/Zones Fitted

  • 1.4 Additional Panels Fitted

  • 1.5 Repeater Panel Fitted

  • 1.6 Protocol

  • 1.7 Battery Size

  • 1.8 Battery Quantity

  • 1.9 Panel Control

  • 1.10 Panel Monitored

  • 1.11 Ancillary Equipment Connected

2.0 Control Equipment

  • 2.1 Mains Supply To CIE Labelled

  • 2.2 Double Pole Isolation

  • 2.3 Separate Cable Entry for mains supply

  • 2.4 Maintenance contract Details Displayed on Panel

  • 2.5 CIE Correctly sited

  • 2.6 Zone Chart Displayed adjacent to CIE

3.0 Alarm Panel Function

  • 3.1 Display Indicators Tested

  • 3.2 Charge Voltage Correct

  • 3.3 Battery Fault Indicator Working

  • 3.4 Mains Fault Indicator Working

  • 3.5 Alarm Load On Batteries Checked

  • 3.6 Alarm Load On PSU Checked

  • 3.8 Printer Functions Tested

4.0 Batteries

  • 4.1 Are Batteries Over 4 Years Old

  • 4.2 Battery Date

  • 4.3 Date Marked on Batteries

  • 4.4 Are Batteries Correct Size

  • 4.5 Are Leads & Connections Good

  • 4.6 Battery Calculations Checked

5.0 Detection

  • 5.1 Are Detectors Sited Correctly

  • 5.2 Are Detectors in Good Condition

  • 5.3 Are Detectors Beyond Service Life(10yrs)

  • 5.4 Are Detectors Correct Type For Enviroment

  • 5.5 Do Detectors Have 500mm Clearance

  • 5.6 Are Detectors 1000mm From A/C/Vent Units

  • 5.7 Are MCP's Sited Correctly

  • 5.8 Are MCP's On All Exits & Change Of Level

  • 5.9 Are All MCP'S Fitted With Hinged Covers

6.0 Sounders

  • 6.1 Are Sounders All the Same Type

  • 6.2 Are There 2 or More Sounder Circuits

  • 6.3 Are Sound Levels Correct

  • 6.4 Are VIDS/VADS sited Correctly

7.0 Ancillary Equipment

  • 7.1 Door Retainers/Closures Operational

  • 7.2 Plant Shutdown

  • 7.3 Gas Shutdown

  • 7.4 Lift Recall

  • 7.5 Other Equipment(Please State) or put N/A

8.0 Visual Inspection

  • 8.1 Is there a Risk assessment in Place

  • 8.2 Any Change In Layout

  • 8.3 Any Additional Partitions Built

  • 8.4 Change of Use to Building

  • 8.5 Has the Building been extended

  • 8.6 Are All Cables Correct Type

  • 8.7 Are Cable Fixings Non-Combustable

9.0 General Requirments

  • 9.1 As Fitted Drawings

  • 9.2 Cable Test Results

  • 9.3 Commissioning Certificate

  • 9.4 Variations Recorded

  • 9.5 BS7671 Certificate for CIE Mains Supply

10.0 ARC

  • 10.1 ARC Notified

  • 10.2 ARC Tested

  • 10.3 ARC Re - Instated

11.0 Certification

  • 11.1 Log Book Checked & Up Dated

  • 11.2 Paper work Filled in & Signed

  • 11.3 Certificate Number

12.0 Comments/Actions

  • 12.1 Comments / Action Required

  • 12.2 Engineers Signiture

Site Equipment

Installed Equipment/Services

  • Fire Risk Assessment

  • Fire Alarm System

  • Emergency Lighting

  • Fire Extinguishers

  • Sprinkler System

  • Ansul System

  • Suppression System

  • Dry Riser System

  • Fire Doors

  • Nurse Call/Refuge System

  • 24 Hour Monitoring

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.