INFORMATION
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
FUEL RECEIPT RECORDS
-
Do fuel load receipt certification documents meet ASTM D1655 specifications? Are files retained for 12 months or more? <br>
PIPELINE
-
Are the following tests being conducted and recorded at the beginning, mid-point (if over 4 hours) and end of the fuel receipts?
-
Visual appearance in White Bucket
-
API Gravity, corrected to 60 degrees F (15 degrees C)
-
Color Membrane
-
Free Water Detection Test
-
Flash Point (Multi-Product Pipeline deliveries only)
-
Is the API Gravity between 37 degrees C and 51 degrees C? (Ensure there is not a change of less than 1 degree API as shown on the shipping document)
TRANSPORT
-
Are the following tests being conducted and recorded?
-
Visual appearance in White Bucket
-
API Gravity, corrected to 60 degrees F (15 degrees C)
-
Is the API Gravity between 37 degrees C and 51 degrees C? (Ensure there is not a change of less than 1 degree API as shown on the shipping document)
MANUAL & TRAINING RECORDS
-
Does the vendor have access to the most current copy of the Mesa Airlines, Inc. Fueling Manual #310?
-
Are employees aware of how to access the Mesa Airlines Fuel Manual through the Mesa non-employee Tech Pubs website?
-
Are training certification records for persons performing equipment and facility inspections current and available for review? <br>
-
Are there any waivers currently on file? (Make copies for reference if applicable) <br>
-
Does fuel vendor have an operations and maintenance manual? <br>
-
Does the vendor have a current copy of the ATA 103?
FUEL FACILITY CHECKS
-
Do facility records for persons performing daily, monthly, quarterly and annual inspections have legible signatures, initials or employee identification numbers? <br>
-
Are fuel facility filter change records kept on file for at least 36 months?
-
Are fuel facility tank inspection and cleaning records kept on file indefinitely?
-
Are Daily, Semi-Annual and Annual check records being retained on file for at least 12 months? <br>
DAILY CHECKS
-
Is the general condition of the tank yard being checked?
-
Are security, fire and safety deficiencies being checked?
-
Are fuel leaks being checked?
-
Are storage tank and reclamation tank sumps being performed and is the first sample being recorded? <br>
-
Are there separate sump recordings for each filter vessel?
-
Are filter differential pressures being recorded for each filter vessel and less than 15PSI? <br>
-
Are there separate differential pressure recordings for each filter vessel? <br>
-
Is the condition of hoses, swivels and nozzle covers being checked? <br>
-
Is the condition of static reels, cables and clamps being checked? <br>
-
Are Fire Extinguishers, inspection tags and seals being checked? <br>
MONTHLY CHECKS
-
Are monthly Millipore tests being performed on each filter vessel and are they available? <br>
-
Do Millipore membrane test results ratings meet (ASTM D2276) a 2A (3A wet) or less? <br>
-
Are free water tests being performed? <br>
-
Can the water kit detect 15ppm or less? <br>
-
Are the results 15ppm or less? <br>
-
Is the shelf life inspected to ensure no expired kits are used? (Aqua-Glo & Metrocator kits do not have a shelf life)
-
Are bonding cable continuity tests 25 ohms or less? <br>
-
Are nozzles removed and the screens checked? <br>
-
Are signs and placards being checked? <br>
-
Are the floating suctions checked? <br>
-
Are Fire Extinguishers, inspection tags and seals being checked? <br>
QUARTERLY CHECKS
-
Are the Emergency shutdown systems being operationally checked? <br>
-
Are the water defense systems being operationally checked on filter/separators? <br>
-
Are tank high level controls being checked? <br>
-
Are product reclamation tank interior inspections complied and cleaned as required? <br>
SEMI-ANNUAL CHECKS
-
Are loading and unloading hoses with reusable fittings pressure checked pre API 1540 requirements? <br>
ANNUAL CHECKS
-
Are the storage tank interiors inspections being checked and documents on ATA Form 103.07 or equivalent? <br>
-
Are filter differential pressure gauges being checked?<br>
-
Are filter elements being replaced every 12 months?<br>
-
Are filter separator/heaters being checked?<br>
-
Are tank vents being checked?<br>
-
Is cathodic protection being checked for underground storage tanks?<br>
-
Are line strainers, if installed, being removed and checked?<br>
-
Are filter vessel water defense systems being checked for operation?<br>
FUEL STORAGE FACILITY WALK-AROUND
-
Is the storage facility secure from public access (Mesa Airlines, Inc. Manual #310)<br>
-
Are all fences and gates in good condition?<br>
-
Are all fence openings in unsecured areas locked when not in use?<br>
-
Are NO SMOKING, FLAMMABLE and JET FUEL or other product signs displayed?<br>
-
Ensure that there are no galvanized, copper alloys, cadmium plated or other materials?<br>
-
Is product identified and color-coded per API 1542 standards?<br>
-
Are flow direction arrows and color-coded bands clearly marked and visible on all piping above ground?<br>
-
Is there an adequate supply of ladders, stands and other related support equipment and in serviceable condition?<br>
-
Is there adequate lighting in the area for night operations?<br>
-
Are filter/separators or full-flow monitors being used for fuel receiving and dispensing?<br>
-
Do filter/separators meet current API Group II Class B Specifications? (API 1581)<br>
-
Do the filter/separators have an automatic water defense system that will either stop fuel flow or alert personnel?<br>
-
Do the filtration vessels have the following:<br>
-
Provisions for eliminating air?
-
Direct reading differential pressure gauges?
-
Manual sump drains?
-
Downsteam & upstream Millipore connections?
-
Pressure relief valves?
-
Placard indicating the month and year of last filter change?
-
Do the filtration vessels nameplate contain all of the following:<br>
-
The Manufactures name and address?
-
The serial and unit number?
-
The API classification?
-
The rated capacity fot JET A?
-
The date of manufacture?
-
The number and model numbers of the coalescer and separator elements?
-
The manufactures recommended element change pressure differential?
-
Are the filter vessel sumps acceptable?<br>
-
Are tank sumps acceptable?<br>
-
Is there a placard indicating the volume of tank drain piping adjacent to the tank drain valves?<br>
-
Does the fuel storage facility have an operating dead man control for all truck loading operations?<br>
-
Does the fuel storage facility have static ground cables at all truck loading points?<br>
-
Are plumbing, valves and hoses free from leaks and damage?<br>
-
Do loading and unloading fuel hoses/couplings meet API 1529 standards and 10 year service life?<br>
-
Are dust covers installed?<br>
-
Is there a system in place to prevent accidental mixing of fuels?<br>
-
Is the emergency shutoff systems placarded with (NFPA 407):<br>
-
At least 2" letters?
-
Method of operation?
-
At least 7' above grade?
-
Can be read 25' away from rack?
-
Is there unobstructed access to the emergency shutoff valves and switches?<br>
-
Are electrical junctions, boxes and conduits intact, with no expose wiring or frayed connections?<br>
-
Are the fire extinguishers in proper place and unobstructed?<br>
-
Ensure that all inspection tags and seals are intact or the extinguisher must be taken out of service?<br>
-
Are floating suctions working properly?<br>
OUTBRIEF & SIGNATURE
-
Please sign below to acknowledge that the audit results have been reviewed with you.
-
Add signature
-
Auditor's Signature:
-
Add signature
-
Auditor Comments: