Information
-
Document No.
-
Audit Title
-
Customer Name
Survey.
-
Work order number.
-
Full Address Details
-
Customer Contact Details
-
General Comment box
-
Work order type
-
Have you gained access?
-
No access, Photo property front door - proof of attendance
-
Can the property be Metered internally?
-
Reasons for Unmeterable Internally.
- IU11- internal Pipework material / condition
- IU12 more than 1 meter required UMP
- IU13 More than 2 meters required (Opt)
- IU14 ISV not located
- IU15 no main ISV for property
- IU16 ISV boxed in
- IU17 ISV behind kitchen units / appliances
- IU18 ISV inaccessible
- IU19 Pipework tees off directly after ISV
- IU20 Shared ISV
- IU21 No room at ISV location
-
Photo ISV
-
Number of Bedrooms.
-
Number of Occupants.
-
Can the property be Metered Externally?
-
Proposed Fit type.
- Internal
- External Public
- External Private
- Exchange
- Read & Verify
- Melco
- Screwin
- Prove supply at dig
- Poodle
-
Date and Time of Survey.
OSV Details
-
OSV Public / Private
-
Consent Form Obtained?
-
Photo obtained consent form
-
OSV pit Depth?
-
OSV pit Location
-
Photo OSV Location
-
Photo Street view
-
Install Comments
-
Traffic Management Comments
Signatures
-
Signee Name & Signature
-
Surveyor Name & Signature