Title Page
-
Audit Title
-
Job Description
-
Service Provider
-
Subcontractor
-
Crew Leader
-
Location
-
Conducted on
-
Prepared by
Audit Protocol for MG SWP CP4.004
6.1 – Confirm Unit Details
-
Have the CPU details been verified against SAP record and MG SWP CP3.001.1 - Cathodic Protection Unit Monitoring Record?
6.2 – Check Current Output
-
Has the technician correctly identified if there is any current output from the unit?
6.3 – Is there DC voltage across the output of the CPU?
-
Has the technician correctly identified if there is any DC voltage?
6.4 – Is there AC voltage going into the CPU?
-
Has the technician correctly identified if there is any AC voltage?
6.5 – Investigate Anode and Structure cable
-
Has the technician correctly tested the anode and structure cable?
6.6 – Unable to identify fault
-
Has the technician referred to more experienced technician or qualified electrical or electronics technician?
Comment and Sign Off
-
Comment and Audit Finding Summary
-
Auditor(s) sign off
-
Auditee (Crew Leader) Sign off