Information
-
Audit Title
-
Job Description
-
Location
-
Conducted on
-
Prepared by
-
Contractor(s)
-
Work Group (name of crew leader & members)
-
Auditor(s)
-
Additional Representative(s)
Planning
-
Has all planning information met job requirements and a job reference number assigned – including construction drawings
-
Have all consumers who will be impacted been notified letter & door knock
-
Has MG Boring Plan requirements been adhered to for Large Diameter
Prior to Commencing Work
-
Have you checked for Life Support Customers in today’s work area, and was it safe to proceed with works?
-
Are all relevant SWMS on site?
-
Has the JSA/site risk assessment identified site specific risks, been signed and dated by all crew members and have SWMS for task been identified?
-
Do all personnel have MG passports on site?
-
Is all training, authorisations and qualifications current for the functional role of the passport holder? (Including contractors e.g. traffic management)
-
Are all identified risk control measures on SWMS and JSA/site risk assessment in place?
-
Has the Traffic/Pedestrian Management Plan been identified/created and available on site and documented on the JSA?
-
Is PPE in accordance with Multinet Gas as a minimum and Service Provider and within inspection/ replacement dates?
-
Has all plant and equipment been checked to ensure it is maintained, calibrated prior to use (prestart checks)?
Locate, Prove & Protect
-
Is underground asset locator trained and competent?
-
Are all DBYD plans (& other) on site? (plan)
-
Have all assets and infrastructure been located and mark out to a quality level B & document on forms/ asset location sheet (Prepare)
-
Have no go zone rules are adhered too - using appropriate tools. (Prepare)
-
Have assets been proved by hand using appropriate Non-conductive tools / NDD to establish exact location to a quality level A? Has asset owner approval been received? (pothole)
-
Have assets been protected onsite asset and infrastructure - barriers / communication been completed? (protect)
-
Has supervisor been advised if high risk scenario? (proceed)
Excavation Prepare bore holes
-
Have launch and receiver pits been excavated appropriately including - Potholing between launch and receiver pits to expose all assets.
-
Have clearances been established from other assets <br> • 150 mm: when crossing any other utilities<br> • 300 mm: when utilities running parallel with other.
-
Has boring been completed as per boring plan – including minimum of 1.5 times the pipe diameter
Prepare Pipe
-
Has plan for transport and storage of the pipe to be completed without damaging integrity of the pipe?
-
(mains) Has pipe quality been checked and meet MG standards? pipe integrity & no damage
-
Has pipe stringing been recorded on JSA and strung in appropriate locations i.e.: not outside hospitals, across roadways / carparks etc..
-
(up to 63mm) Is butt fuse equipment in serviceable condition, calibrated and regularly tested with pyrometer?
-
Has pipe been cut and clamped appropriately.
-
Has pipe identification been completed - top of pipe, at each side of clamp.
-
Has heating iron been used at 220 degrees using a clean facing tool (iron) and approved paper towel. Once fused has fusion remained undisturbed for 2 minutes and cooled for 15minute in lock clamp.
-
(Large Diameter) Ensure Large diameter butt fusion chip is correct. Allow the joint to remain undisturbed for two minutes until joint has solidified.
-
Approved automatic Butt fusion machine is be used
-
Pipe identification to be on top of pipe, at each side of clamp.
-
Complete a test joint to ensure fusion is functioning appropriately.
-
Clean facing tool and heating iron with approved paper towel prior and after use.
-
Ensure pipe is stable in fusion equipment and on rollers.
-
Ensure heating cycle is completed and cooling time is adhered too.
-
(Electro fusion) Has pipe been Scrape / champhered and has line up clamp been used
-
Has pipe been marked at centre of coupling on both ends of pipe?
-
Has coupling been fused for required heat time and cooling time is met.
-
Has Operator ID been noted on the joint
Lay Pipe
-
Has copper wire been taped to the pipe every 3.0 meters?
-
Has a break away been installed between the rods and pipe?
-
Has one full length must be pulled through for inspection
Pressure Test – 1hrs
-
Prior to pigging all equipment is to be pressure rated and calibrated. Has a pigging plan been endorsement & pigging equipment pressure rated and calibrated
-
Has pigging been completed for steel mains & long radius bends must be used.
-
Has pressure test been progressively completed daily using endorsed equipment that is maintained and calibrated?Has final pressure test been completed using endorsed equipment that is maintained and calibrated - and for 24 hours using data logger or chart recorder.
Connect pipe to main
-
(poly-poly) Has static electricity been controlled by using wet rags
-
Has main been squeezed off and purged using flame trap.
-
Has pressure been released from newly laid main (pressure test step)
-
Has pipe been cut with pipe cutters – scrapped and champered
-
Has centre of coupling been marked on both ends, installing coupling and clamp
-
Has coupling been fused safely for required heat time and ensure cooling time is met
-
Has purging been completed - With reference to the commissioning plan
-
Has waste risk been managed using endorsed procedures/ training? (i.e. coal tar enable/ asbestos or plastic jacket)
-
Has Poly Squeeze off been reinforced using stainless steel repair clamp
-
(Williamson tee) Has an approved MG Welder been used to weld Williamson Tee / shortstop
Commission and purge service
-
Has commission and purging requirements been completed with reference to commissioning plan<br>Has purge equipment been pressure rated & purging completed at 100% gas.
Backfill and Reinstate
-
Has a steel road plate been installed to cover excavation (ie. launch or receiver pit) – and barricaded for safety.
-
Has trench been backed filled & compacted every 150mm & marker tape been used
-
Does reinstatement / clean up meet property owner, Local Government authorities and Vic Roads requirements.
-
Have temporary reinstatement been left in a safe manner and customer notification been completed (letter drop).
Complete Documentation
-
Has a permanent reinstatement notification been completed
-
Has mainlaying documentation been completed (as trained) – Recording correct mainlaying size, length, pressure, fittings and as laid drawings
-
Other comment
Sign off
-
Auditor(s)
-
Auditee (Crew Leader)