Information

  • Audit Title

  • Job Description

  • Location
  • Conducted on

  • Prepared by

  • Service Provider

  • Contractor(s)

  • Work Group (name of crew leader & members)

  • Auditor(s)

  • Additional Representative(s)

Planning

  • Has all planning information met job requirements and a job reference number assigned.

Prior to Commencing Work

  • Have you checked for Life Support Customers in today’s work area, and was it safe to proceed with works?

  • Do all personnel have MG passports on site?

  • Is all training, authorisations and qualifications current for the functional role of the passport holder? (Including contractors e.g. traffic management)

  • Are all relevant SWMS on site?

  • Has the JSA/site risk assessment identified site specific risks, been signed and dated by all crew members and have SWMS for task been identified?

  • Are all identified risk control measures on SWMS and JSA/site risk assessment in place?

  • Has the Traffic/Pedestrian Management Plan been identified/created and available on site and documented on the JSA?

  • Is PPE in accordance with Multinet Gas as a minimum and Comdain expectations and within inspection/ replacement dates?

Locate, Prove & Protect

  • Is underground asset locator trained and competent?

  • Are all DBYD plans (& other) on site? (plan)

  • Have all assets and infrastructure been located and mark out to a quality level B & document on forms/ asset location sheet (Prepare)

  • Have no go zone rules are adhered too - using appropriate tools. (Prepare)

  • Have assets been proved by hand using appropriate Non-conductive tools / NDD to establish exact location to a quality level A? Has asset owner approval been received? (Pothole)

  • Have assets been protected onsite asset and infrastructure - barriers / communication been completed? (Protect)

  • Has supervisor been advised if high risk scenario? (Proceed)

  • Is the gas meter location in accordance with engineering standard ES-DD-4352

  • Has Service Pipe and Gas meter assembly been tested to ensure it is not ‘electrically’ live using an approved tester?

  • Have wet rags been used when Disconnect meter using cross bonding leads?

  • If voltage is detected – was restrict area, inform consumer, isolate power, contact supervisor? Note: do not carry out any work until fault has been determined

Excavate - Prepare service trench & mains excavation

  • Are service line routes established as a straight line between the tapping point and the meter? <br>When not practicable, have the service lines entered the property in a straight line from the tapping point?

  • Has the trench been excavated to ensure the depth will meet MG requirements for pipe cover?

  • Have clearances been established from other assets <br>• 150 mm: when crossing any other utilities <br>• 300 mm: when utilities running parallel with other.

  • Has appropriate pipe bedding material been used?

  • (If Boring) Prior to boring have all assets that may be crossed during boring activities been fully exposed? <br>Prove by hand or using Non-conductive tools / NDD to establish exact location to a quality level A - using appropriate tools & asset owner approval

  • Is the bore at minimum of 1.5 times the pipe diameter? <br>When requirement cannot be met – risk assess prior to commencing work. i.e. ground conditions SWP 8.3

  • (If inserting) Has the pipe been inserted at the correct depth?

  • Has the carrier pipe been sealed at each break to prevent gas travelling if a leak occurs?

Prepare Service

  • Does pipe quality meet MG standards?<br>i.e. pipe integrity - no damage<br>

  • Has pipe been transported and stored appropriately – no damaged to the integrity of the pipe?<br>i.e.: store pipe off ground, ensure capped and pipes are secure.

Lay Pipe

  • Has copper wire been taped to the pipe every 1.5 meters?

  • Has pipe been laid snaked in trench to allow for pipe contraction?

  • If installing a below ground regulator (black Box) – has approval been received from MG.

Connect Pipe to Upstand

  • Has upstand been bent at the correct height (350mm above finished ground) at the meter position? <br>Note: Copper service risers are only to be used in the Multinet Gas South Gippsland town’s area and only when steel risers are not available.

  • Is fusion & all electrical equipment been maintained, within calibration, and electrical test dates and in serviceable condition? <br>(socket fusion)

  • Prior to socket fusion is the pipe cleaned, stiffener in correct position and iron at the correct temperature?

  • Has the pipe ends been placed into the heating iron for a timed period (10 seconds- using a timing device) to complete socket fusion?

  • If manifolds are installed: <br>- Has manifold been stamped with a traceability number and painted as per MG Engineering standard. <br>- have they been supported (brackets) <br>- Has it been connected to the service via electrofusion as per MG mainlaying SWP 5.10 S6.5

  • Has upstand been supported in the trench with a wall bracket or approved aluminium stakes?

  • Has an Additional Service Isolation Valve (ASIV) been installed outside of property? (internal service only)

Connect Pipe to Main

  • Has the correct size tee been selected to suit the main and service pipe?

  • Has the clamp and service tee been installed onto a cleaned and prepared main and service tee?<br>(Saddle & Socket Fusion)

  • Is fusion & all electrical equipment been maintained, within calibration, within electrical test dates and in serviceable condition?

  • Is heating iron is at 220 degrees?

  • Has the 3 second test pattern been completed prior to performing saddle fusion?

  • Was heating iron placed on main with the clamp service tee down for the correct time period? (40 seconds - using timing device)

  • Was fusion cooling time period completed? (15 Minutes)

  • Has coating been removed as per SWP 1.2 <br>(Steel Main Welding)

  • As Steel welds been performed as AS4645 and MG procedure?

  • Have steel pipes been wrapped as Per SWP 3.7

Cover Pipe

  • Has the pipe been covered with appropriate packing material?(e.g. 80mm cover)

Pressure Test

  • Is Washington pressure tester is maintained, within test dates, green fluid is within glass & inspected prior to use (no defects)?

  • Has Washington pressure tester been connected to upstand valve

  • Has the entire service been pressure tested? (5 minute stabiliser - 3 minute test)

  • If result of pressure test fails to meet expectations <br>– has crew investigated and fix problem area and retested until a positive result is achieved?

Corrosion Protection

  • Has protective wrapping and/or paint been applied to bare metal surfaces.

Commission & Purge

  • Was the flare stack equipment connected to the upstand valve and ensure valve is in the 'off position'?

  • Has the main been tapped via service tee cutter and install service tee cap?

  • Has a soap test been completed on service tee cap?

  • Has gas flare stack been purged to ensure 100% gas reading on gas detector?

  • Has flare stack equipment been disconnected - ensuring valve is in 'off position' and cap service valve?

Backfill & Reinstate

  • When backfilling service line trench and mains excavation has compaction been completed every 150mm?

  • Does reinstatement / clean up and meets property owner, Local Government authorities and Vic Roads requirements?

  • Is temporary reinstatement safe i.e. level & barriers and customer notification has been completed (letter drop)?

Document

  • Has service documentation been completed ensuring correct service size, length, pressure and fittings are accurately recorded?

  • Has permanent reinstatement notification been completed?

  • Have red card (refix relight card) been provide to applicable properties?

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.