Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

MSS 1 - Personal Protective Equipment (PPE) Policy

  • Are all personal wearing a safety helmet

  • Are all personal wearing Hi-Viz clothing to the relevant standard BSEN471: 2003 class 2 or Railway group Standard GO/RT3279

  • Are all personal wearing eye protection to EN 166, 1F

  • Are all personal wearing Cut 3 gloves

  • Are all personal wearing safety boots to EN 20345, which includes midsole penetration protection

  • Are all personal who are required to wear RPE been subject to a robust system of face-fit testing and training that meets legal requirements.

  • Are all VINCI employees wearing JSP Force 8 Respirator with P3 Press to Check Filters, or JSP Jetstream Powered respirator System

MSS 2 - Close Call and Positive Intervention Reporting

  • Have reporting stations, promotional posters, report cards been located in suitable locations onsite

  • Appointment of Close Call Champion

  • The site team must ensure that all those working on the site are fully aware of the arrangements for reporting Close Calls / Positive Interventions, and the different ways in which a report may be raised.

  • Have Close Call reports been reviewed and closed out in a timely manner

  • Has the Site team issued feedback to the individual raising the report, and summarised positive interventions on site boards

  • Has the Visiting Health and Safety Advisor reviewed the reports and actions during their site visits

MSS3 - Management of Substances Hazardous to Health

  • Have COSHH Assessments been carried out for all substances hazardous to health.

  • Has a COSHH coordinator been appointed

  • Have the appropriate control measures been identified and documented

  • Does the person supervising the work activity understand the control measures and are they been followed

  • Has health surveillance been arranged if identified within the assessment

  • Have COSHH been reviewed once they have reached their expiry date

MSS4 - Working at Height

  • Has design and planning reduced the need to work at height

  • Have risk assessments and method statements been developed and communicated to control risks from working at height

  • Have the use of ladders, stepladders and hop-ups been controlled to an absolute minimum, has the use be en approved by the Senior Site Representative (SSR) or nominated manager

  • Do all ladders, stepladders and hop-ups bear a VINCI ladder tag, clearly identifying that it has been authorised for use by Vinci management.

  • Does the site have an up to date register of all authorised equipment

  • The following work equipment for work a height must be controlled by a Vinci tagging system, ladders, stepladders,hop-ups, scaffold (system and tube and fitting), mobile tower, mobile elevating work platforms (MEWP) and podium steps do they comply

  • Does the site have an emergency rescue procedure for working at height and his it documented and communicated to all necessary personnel

  • Do all Mobile booms (3b) have anti entrapment devices fitted for direct and sub-contract operations

  • Do all net riggers, steel erectors and associated trades hold IPAF+ or CPCS Competent Operator Certification

  • Are all scaffolds constructed as per compliance sheet or design

  • Are all scaffold boards used onsite compliant with BS 2482

  • Are all scaffolders onsite working to SG4: Preventing Falls in Scaffolding

MSS 5 - Management and Control of Lifting Operations

  • Has the Senior Site Representative (SSR) nominated the Appointed Person (AP) and is it recorded in the Project Plan

  • Does the Appointed Person hold a current CPCS and have they got the relevant experience

  • Have all Crane Supervisors and Slinger/Signallers been formally interviewed and formally appointed by the Appointed Person.

  • Does the project have a specific Project Lifting Plan.<br>

  • Does a register of all project lift plans exist and his it kept up to date.

  • Have all lifting acçessories got a current 6 monthly inspection certificate

  • Does all lifting equipment have a currently 12 monthly Thorough Examination Certificate and are they kept in a register

  • Does the Appointed Person hold regular meetings with the lifting teams

  • Does the site have an effective procedure for reporting defects or incidents and taking corrective actions

MSS 6 - Permit to penetrate the ground

  • Help

MSS 7 - Management of Asbestos

  • Help

MSS 8 - Fire Safety

  • Help

MSS 10 a Safety Leadership and Communication

  • Help

MSS 11 - Statutory Medicals

  • Help<br>

MSS 12 - Management of Confined Spaces

  • Help

MSS 13 - Office Safety

  • Help

MSS 14 - Risk Management in Vinci Construction Uk

  • Help

MSS 15 - Health, Safety, and Environmental Training in VCUK

  • Help

MSS 16 - Incident Investigation and Reporting

  • Help

MSS 17 - Drug and Alcohol Testing

  • Help

MSS 18 - Managing Occupational Road Risk

  • Help

MSS 19 - Management of Gas Installation

  • Help

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.