Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Site Documentation
-
Current versions of Health, Safety and Environment Policies and insurances on site?
-
Health and Safety Plan is in place & has been reviewed & updated as required?
-
PUK Health and Safety Poster is prominently displayed and correct information added?
-
PUK Health Booklets have been issued and signed for by Operatives
-
Is there an accident book on site and correctly filled out
-
Sub-Contractor safety inspections are occurring at an agreed schedule?
-
Daily Pre-starts meetings are occurring every day - Subcontractors are in attendance?
-
Toolbox talks for the site are occurring as schedule and added to toolbox talk register ?
-
PUK / Sub-Contractor Training Matrix available for inspection and updated correctly?
-
The Sub-Contractor been issued with the PUK Safety Standards document and a copy is available for inspection?
Method Statements and Risk Assessment
-
Method Statement Register in place and has a minimum 2 week look ahead?
-
Method Statements are being signed as accepted by PUK Site Management?
-
RAMS are reviewed regularly, signed and understood by those undertaking tasks?
Health
-
Health monitoring required and being undertaken e.g. Fit to Work, SCM?
-
Has a vibration assessment been undertaken where required?
Safety
-
Register / Scheme of Works
-
Statutory Registers are being completed e.g. LOLER / W@H equipment?
-
Non Statutory Registers are being completed e.g. PAT, Tool tethers
-
Is there a Project specific register for all high risk tasks completed?
-
Lifting Operations
-
Lifting Plan in place for the operation and in compliance of BS 7172 part 1
-
Is there an on site AP compiling and reviewing the Lifting Plans?
-
Do all lifting chains / slings on site have (thorough examination 6 months) certificates?<br><br><br>
-
CoSHH
-
Have all hazardous substances been assessed?
Other Information
-
Other Observations?
-
Observations closed out from last inspection?
Sign Off
-
Signature of person inspecting
-
Signature of PUK Manager