Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Site Documentation

  • Current versions of Health, Safety and Environment Policies and insurances on site?

  • Health and Safety Plan is in place & has been reviewed & updated as required?

  • PUK Health and Safety Poster is prominently displayed and correct information added?

  • PUK Health Booklets have been issued and signed for by Operatives

  • Is there an accident book on site and correctly filled out

  • Sub-Contractor safety inspections are occurring at an agreed schedule?

  • Daily Pre-starts meetings are occurring every day - Subcontractors are in attendance?

  • Toolbox talks for the site are occurring as schedule and added to toolbox talk register ?

  • PUK / Sub-Contractor Training Matrix available for inspection and updated correctly?

  • The Sub-Contractor been issued with the PUK Safety Standards document and a copy is available for inspection?

Method Statements and Risk Assessment

  • Method Statement Register in place and has a minimum 2 week look ahead?

  • Method Statements are being signed as accepted by PUK Site Management?

  • RAMS are reviewed regularly, signed and understood by those undertaking tasks?

Health

  • Health monitoring required and being undertaken e.g. Fit to Work, SCM?

  • Has a vibration assessment been undertaken where required?

Safety

  • Register / Scheme of Works

  • Statutory Registers are being completed e.g. LOLER / W@H equipment?

  • Non Statutory Registers are being completed e.g. PAT, Tool tethers

  • Is there a Project specific register for all high risk tasks completed?

  • Lifting Operations

  • Lifting Plan in place for the operation and in compliance of BS 7172 part 1

  • Is there an on site AP compiling and reviewing the Lifting Plans?

  • Do all lifting chains / slings on site have (thorough examination 6 months) certificates?<br><br><br>

  • CoSHH

  • Have all hazardous substances been assessed?

Other Information

  • Other Observations?

  • Observations closed out from last inspection?

Sign Off

  • Signature of person inspecting

  • Signature of PUK Manager

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.