Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Health
-
Are face masks to a FFP3 standard and operatives face fit tested to their specific mask?
-
Is dust being suppressed and kept to a minimum?
Safety
-
Competency
-
Do all Operatives have valid trade specific CSCS cards?
-
Are all plant operators on site licenced, competent and fit for work?
-
Fire
-
Is there any Hot Work being performed? (Welding / spark emitting / heat generating) and permits controlled?
-
Fire extinguishers on site, service labels signed and serviced annually?
-
Lifting Operations
-
Lifting Plan in place for the operation and in compliance of BS 7172 part 1
-
Is there an on site AP compiling and reviewing the Lifting Plans?
-
Are the Lifting Operations complying with the Lift Plan and PUK Safety Standards?
-
Does all lifting equipment and accessories comply with the statutory provisions?<br><br><br>
-
Panels are design with secondary redundant lifting points and these are being used?
-
Working at Height
-
Work at Height is being organised and planned?
-
All objects are being correctly tethered where possible?
-
Work at height equipment in compliance within manufacturer's recommendations?
-
Plant / Equipment
-
Daily Pre-start check sheets been provided for plant and completed by Operator?
-
Cable management techniques are being employed?
-
CoSHH
-
MSDS sheets available and on site with CoSHH register in place?
-
Is there a suitable CoSHH store on site for the substances?
-
Housekeeping
-
Are work areas being kept in a tidy condition?
-
P.P.E.
-
P.P.E. in compliance with PUK Safety Standards?
-
P.P.E. in good condition and presentable in appearance?
-
First Aid
-
Stocked First Aid kits & a minimum of 1 certified first aider on site? (ensure that the kit supplies within "used by date")
-
Are emergency contact numbers available to personnel on site e.g. First Aid / Fire Wardens?
Site and Facilities
-
Site facilities appropriate - fresh drinking water, toilets, canteen, lockers, smoking area?
-
Site signage appropriate - visible, accurate?
-
Site layout effective & allow effective access & egress to site & work zones?
Other Information
-
Other Observations?
-
Observations closed out from last inspection?
Sign Off
-
Signature of person inspecting
-
Signature of PUK Manager