Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Record-keeping, Posters

  • State &Federal postings are in place

  • OSHA Notice / 300 Log

  • Emergency Telephone #'s

  • 1st Report of Incident & Medical Authorization forms on site

  • Emergency Maps to clinics & hospitals posted

Communication

  • Pre-task Planning

  • Weekly stand-down meetings conducted by superintendent

  • Monthly stand-down meetings conducted by Project Manager

PPE

  • Appropriate clothing in use (4" sleeves on shirts, work wise pants)

  • Hardhat, Safety Glasses, Work Gloves, Proper Boots

  • FR Clothing(welding jackets in use)

  • High Visibility Vest

  • Respirator

  • Other PPE being used properly( protective sleeves and cut resistant gloves during demo)

  • First Aid Kit/Blood Spill Kits in place and fully stocked

  • Hearing protection in place

Cranes, Riggers, Signal Person

  • Daily Inspection

  • Qualified Operator

  • Qualified Rigger/Signal Person

  • Swing Radius Controlled

  • Critical Lift Permit

  • Rigging Inspected, all tags in place and stored properly

  • Crane Signals posted in the immediate work area

  • Overhead power line plan in place and training provided

Ladders

  • Properly Inspected

  • Properly Used

  • Necessary labels visible

Fall Protection

  • Proper fall protection at 6' or greater

  • Personnel below are protected from falling objects

  • Roof Fall Hazards addressed and Access Permit in place

  • Open sided floors or platforms 6' or more from ground equipped with proper guardrail

  • Openings properly barricaded or covered

  • Hole covers in place secured and marked appropriately

  • Stairs equipped with handrails

  • Slips/trips/fall issues addressed

  • Snow & Ice Management plan in place

Fire Protection & Housekeeping

  • Trash picked up and disposed of regularly

  • Aisles and passageways clear

  • Flammable and explosive materials stored and handled safely

  • Required number of fire ext. properly located and inspected monthly

  • All vehicles & other mobile equipment provided with fire protection

  • LP cylinders stored outdoors

  • Project field office/break trailers clean

  • Materials stacked properly, lumber is free of protruding nails

Aerial Lifts

  • Daily Inspection

  • Proper Use

  • Fall Protection if required

Hot Work/Cutting & Welding

  • Engineering Controls in place (ventilation, fume eaters, fresh air)

  • Welding screens provided

  • Proper additional PPE provided

  • Equipment in good repair, insulators, grounding, welding leads

  • Adequate ventilation or respirator utilized

  • Hot work permits in place and being followed

  • Fire ext. and fire watch in place

  • O2 and Acetylene stored properly

Electrical

  • Assured Grounding Program up to date

  • All electrical equipment in good condition

  • Proper GFCI

  • Good work practices (cords out of pathways, kept out of water, etc.)

  • NFPA 70 E in place and followed

Confined Space

  • Declared Permit or non-permit

  • Air monitor on site (properly calibrated, properly used)

  • Atmosphere test results documented

  • Energy sources locked out

  • Adequate ventilation

  • Rescue plan in place

  • 4- Gas Meter in place and calibration up to date

Cylinders

  • Compressed gas cylinders stored and secured upright

  • Cylinders capped

Haz Com

  • www.sdsbinderworks.com

  • Employees up to date with GHS training

  • Updated project SDS book on site

  • Containers properly labeled

  • Spills cleaned up appropriately

Excavations

  • Was one-call system contacted

  • Protective system

  • Surface encumbrances protected/supported

  • Ladder within 25' of all employees

  • Utilities protected/supported

  • Spoil piles minimum of 2' from edge of excavation

  • Overhead power lines minimum distance of 20'

  • Inspected daily and documented on Access Permit

Haz-Mat

  • Lead

  • Asbestos

  • Mercury

  • Silica

Mobile Equipment/Material Handling

  • Back-up alarms

  • Daily inspections conducted and documented

  • Trained operators

  • Seat belts & rollover protection in place

  • Loads not flow over people

  • Tag lines used as necessary

Scaffolding

  • Set up & used properly

  • Inspected before use

  • Proper access

  • Secured/tied/guys in place @4:1

  • Fall protection in place all open sides and edges

Concrete/Masonry

  • All impalement hazards addressed (rebar, conduit, pipe, steel pins)

  • Limited access zones in place

  • Wall bracing in place

  • Wet sawing of CMU ( no dry cutting)

Environmental

  • Erosion control plan in place

  • DNR reporting complete

Hand/Power Tools

  • Employee training in place

  • Guarding in place

  • Compressed air lines secured

General Items

  • Recycling system in place

  • Tobacco free work site

  • Weapons free work environment

  • Parking system in place

  • Client expectation being met ( hair nets, beard nets, hospital and food regulations )

Positive Insight

  • Comments

  • Add signature

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.