Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Record-keeping, Posters
-
State &Federal postings are in place
-
OSHA Notice / 300 Log
-
Emergency Telephone #'s
-
1st Report of Incident & Medical Authorization forms on site
-
Emergency Maps to clinics & hospitals posted
Communication
-
Pre-task Planning
-
Weekly stand-down meetings conducted by superintendent
-
Monthly stand-down meetings conducted by Project Manager
PPE
-
Appropriate clothing in use (4" sleeves on shirts, work wise pants)
-
Hardhat, Safety Glasses, Work Gloves, Proper Boots
-
FR Clothing(welding jackets in use)
-
High Visibility Vest
-
Respirator
-
Other PPE being used properly( protective sleeves and cut resistant gloves during demo)
-
First Aid Kit/Blood Spill Kits in place and fully stocked
-
Hearing protection in place
Cranes, Riggers, Signal Person
-
Daily Inspection
-
Qualified Operator
-
Qualified Rigger/Signal Person
-
Swing Radius Controlled
-
Critical Lift Permit
-
Rigging Inspected, all tags in place and stored properly
-
Crane Signals posted in the immediate work area
-
Overhead power line plan in place and training provided
Ladders
-
Properly Inspected
-
Properly Used
-
Necessary labels visible
Fall Protection
-
Proper fall protection at 6' or greater
-
Personnel below are protected from falling objects
-
Roof Fall Hazards addressed and Access Permit in place
-
Open sided floors or platforms 6' or more from ground equipped with proper guardrail
-
Openings properly barricaded or covered
-
Hole covers in place secured and marked appropriately
-
Stairs equipped with handrails
-
Slips/trips/fall issues addressed
-
Snow & Ice Management plan in place
Fire Protection & Housekeeping
-
Trash picked up and disposed of regularly
-
Aisles and passageways clear
-
Flammable and explosive materials stored and handled safely
-
Required number of fire ext. properly located and inspected monthly
-
All vehicles & other mobile equipment provided with fire protection
-
LP cylinders stored outdoors
-
Project field office/break trailers clean
-
Materials stacked properly, lumber is free of protruding nails
Aerial Lifts
-
Daily Inspection
-
Proper Use
-
Fall Protection if required
Hot Work/Cutting & Welding
-
Engineering Controls in place (ventilation, fume eaters, fresh air)
-
Welding screens provided
-
Proper additional PPE provided
-
Equipment in good repair, insulators, grounding, welding leads
-
Adequate ventilation or respirator utilized
-
Hot work permits in place and being followed
-
Fire ext. and fire watch in place
-
O2 and Acetylene stored properly
Electrical
-
Assured Grounding Program up to date
-
All electrical equipment in good condition
-
Proper GFCI
-
Good work practices (cords out of pathways, kept out of water, etc.)
-
NFPA 70 E in place and followed
Confined Space
-
Declared Permit or non-permit
-
Air monitor on site (properly calibrated, properly used)
-
Atmosphere test results documented
-
Energy sources locked out
-
Adequate ventilation
-
Rescue plan in place
-
4- Gas Meter in place and calibration up to date
Cylinders
-
Compressed gas cylinders stored and secured upright
-
Cylinders capped
Haz Com
-
www.sdsbinderworks.com
-
Employees up to date with GHS training
-
Updated project SDS book on site
-
Containers properly labeled
-
Spills cleaned up appropriately
Excavations
-
Was one-call system contacted
-
Protective system
-
Surface encumbrances protected/supported
-
Ladder within 25' of all employees
-
Utilities protected/supported
-
Spoil piles minimum of 2' from edge of excavation
-
Overhead power lines minimum distance of 20'
-
Inspected daily and documented on Access Permit
Haz-Mat
-
Lead
-
Asbestos
-
Mercury
-
Silica
Mobile Equipment/Material Handling
-
Back-up alarms
-
Daily inspections conducted and documented
-
Trained operators
-
Seat belts & rollover protection in place
-
Loads not flow over people
-
Tag lines used as necessary
Scaffolding
-
Set up & used properly
-
Inspected before use
-
Proper access
-
Secured/tied/guys in place @4:1
-
Fall protection in place all open sides and edges
Concrete/Masonry
-
All impalement hazards addressed (rebar, conduit, pipe, steel pins)
-
Limited access zones in place
-
Wall bracing in place
-
Wet sawing of CMU ( no dry cutting)
Environmental
-
Erosion control plan in place
-
DNR reporting complete
Hand/Power Tools
-
Employee training in place
-
Guarding in place
-
Compressed air lines secured
General Items
-
Recycling system in place
-
Tobacco free work site
-
Weapons free work environment
-
Parking system in place
-
Client expectation being met ( hair nets, beard nets, hospital and food regulations )
Positive Insight
-
Comments
-
Add signature
-
Add signature