Title Page
-
Site conducted
-
Inspection Month
-
Prepared by
Exterior Lights
-
EXT-01 - East Warehouse Receiving Bay Pole
-
EXT-02 - East Conference Room Exit Door
-
EXT-03 - Main Entrance Door
-
EXT-04 - Walkway Step
-
EXT-05 - Field Service Exit Door
-
EXT-06 - North Machine Shop Exit Door
-
EXT-07 - East Rotor Shop Exit Door North
-
EXT-08 - Breezeway Gate Entrance
-
EXT-09 - Lumber Storage North
-
EXT-10 - Lumber Storage South
-
EXT-11 - East Wall Rotor Shop Midway
-
EXT-12 - North Wall CNC Room
-
EXT-13 - Aux 1 Panel Room
-
EXT-14 - East Rotor Shop Entrance Door South
-
EXT-15 - West Machine Shop Bay
-
EXT-16 - Propane Storage
-
EXT-17 - South West Machine Shop Pole
-
EXT-18 - Warehouse North Exit Door West
-
EXT-19 - Metal Storage / Alley Gate
-
EXT-20 - South Rotor Shop Exit Door
-
EXT-21 - West Wall Rotor Shop South 1
-
EXT-22 - West Wall Rotor Shop South 2
-
EXT-23 - West Wall Rotor Shop
-
EXT-24 - West Wall Rotor Shop North 1
-
EXT-25 - West Wall Rotor Shop North 2
Inspection Verification
-
Company Performing Inspection
-
Inspection Date
-
Signature