Client: McLaren
-
Job title: Wembley Park W03
-
MPrice inspection: ACM FEATURE BAND CLADDING TO BOULEVARD AND RELATED WORKS
-
Location (Floor & Grid Lines)
-
Block
Documentation & Specification
-
Are current installation Drgs available?
Sub-Structure
-
Are helping hand supports / rails installed and fixed in accordance with drgs?
-
Is support structure correctly aligned?
Fire Barrier Installation
-
Is the horizontal barrier aligned, continuous and at right angles to the slab face?
-
Is the black intumescent strip facing the cladding panel with a max 25mm ventilation gap?
-
Are all joints tightly abutted and taped?
-
Are there any gaps in the system, at slab edge, at abutment with lateral components or generally through the system?
-
Are the correct brackets used, installed at the correct centres with protruding ends counter-folded and trimmed to 10-20mm?
-
Is the vertical cavity barrier continuous?
-
Is the cavity well packed (Duo Slab)?
Panel & Trim Installation
-
Are the panels correctly installed and aligned?
-
Is the trim / anti-lift installed?
Final Inspection of Associated Grills / Trims / PHDWs to the Floor
-
Are all associated components to the floor correctly installed and damage free?
-
Is all notified damage adequately repaired?
Any Additional Photos of works
-
Photo of works
Comments
-
Are there any other comments?
Signatures
-
On behalf of MPrice
-
On behalf of McLaren