Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
FINAL Q/A EXTERNAL INSPECTION
-
Wembley W03
- A
- B
- C
- D
- E
- F
- G
- H
-
Level
- -1
- ground floor
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
-
Elevation
- North
- South
- West
- East
- North West
- North East
- South West
- South East
INSPECTION/QA
-
Are the panels,grills and trickle vent correctly installed and aligned?
-
Any visible damage
-
Is mastic application complete,without gaps and well tooled to the required quality?
-
Is the glass installed correctly and inspected with no breakages
SIGNATURES
-
Checked on behalf of M Price
-
Checked on Behalf of Mclaren (Deemed Acceptable if not returned within 24 hours )