Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Client: McLaren

  • Job title: Wembley Park W03

  • MPrice inspection: Completion of Works following Scaffold Tie Removal

  • Location (Floor & Grid Lines)

  • Block

Documentation & Specification

  • Are current installation Drgs available?

Subframe Inspection

  • Is VCL (Tyvek), subframe / Helping Hand Bkts installed and fixed correctly?

  • Is fire stop and cavity barrier continuous with relevant compression / offset from panel (for intumescent layer)?

Panel Installation

  • Is insect mesh / trim installed, with panel correctly aligned?

Final Inspection

  • Are all associated components / mastic complete and to relevant quality level?

  • Are all works clean & damage free?

Any Additional Photos of works

  • Photo of works

Comments

  • Are there any other comments?

Signatures

  • On behalf of MPrice

  • On behalf of McLaren

End of report

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.