Client: McLaren
-
Job title: Wembley Park W03
-
MPrice inspection: Completion of Works following Scaffold Tie Removal
-
Location (Floor & Grid Lines)
-
Block
Documentation & Specification
-
Are current installation Drgs available?
Subframe Inspection
-
Is VCL (Tyvek), subframe / Helping Hand Bkts installed and fixed correctly?
-
Is fire stop and cavity barrier continuous with relevant compression / offset from panel (for intumescent layer)?
Panel Installation
-
Is insect mesh / trim installed, with panel correctly aligned?
Final Inspection
-
Are all associated components / mastic complete and to relevant quality level?
-
Are all works clean & damage free?
Any Additional Photos of works
-
Photo of works
Comments
-
Are there any other comments?
Signatures
-
On behalf of MPrice
-
On behalf of McLaren