  • MPrice inspection: BOULEVARD - Fire Barrier / Insulation & ACM Cladding Sub-Structure

  • Location (Floor & Grid Lines)

  • Block

Documentation & Specification

  • Are current installation Drgs available?

Fire Barrier Installation

  • Is the horizontal barrier aligned, continuous and at right angles to the slab face?

  • Is the black intumescent strip facing the cladding panel with a max 25mm ventilation gap?

  • Are all joints tightly abutted and taped?

  • Are there any gaps in the system, at slab edge, at abutment with lateral components or generally through the system?

  • Are the correct brackets used, installed at the correct centres with protruding ends counter-folded and trimmed to 10-20mm?

  • Is the vertical cavity barrier continuous?

  • Is the cavity well packed (Duo Slab) with relevant compression?

ACM Panel Sub-Structure

  • Are helping hand supports / rails installed and fixed in accordance with drgs?

  • Is support structure correctly aligned?

Any Additional Photos of works

  • Photo of works

Comments

  • Are there any other comments?

Signatures

  • On behalf of MPrice

  • On behalf of McLaren

End of report

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.