Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Signature
Basement
HV/LV Switch Room:-
-
Main LV isolators
-
Battery tripping pack
-
Vocall 8 line exchange unit
-
Sump pump alarm panel
-
Emergency lighting enclosure
-
Ups units x 2
-
Fm 200 fire suppression bottle
Tank room:-
-
Water circulating pumps
-
Pump pressure (5.5bar) & control panel
-
Rainwater harvesting unit control panel
-
Rainwater harvesting rain meter
-
Rainwater harvesting mains top up meter
-
Check for leaks from tanks & associated pipework
Data room & comms room:-
-
Hyrdrosense water detection unit
-
Extinguishing control unit
-
Vesda unit
Boiler room:-
-
Main boiler plant control panel
-
Gas detection system (look directly in line with unit)
-
Vt pumps 1 & 2
-
Boiler 1 Temp.
-
Boiler 2 Temp.
-
All pressure & temperature gauges (see photos)
-
Grundfos pressurisation unit (3.6bar)
-
Wilo secondary circulation pump
Effluent tank room:-
-
Pump 1
-
Pump 2
-
Take daily gas meter reading
Hub:-
-
Take daily water meter reading
Ground floor
Euclid staff entrance:-
-
Fire panel
-
Colt smoke vent panel
-
Vocall panel
-
Intruder alarm
Bms room:-
-
Fire panel
-
Daikin control panel (touch screen. Any faults yellow)
-
Vocall panel
-
Intruder alarm
Level 1
-
Vesda unit within cupboard
Level 1a
-
Generator
Level 5 plant deck
-
Air handling unit 1 control panel (see photos)
-
Air handling unit 2 control panel (see photos)
-
Air handling unit 3 control panel (see photos)
All floors
-
Vocall panels
-
Lift 1
-
Lift 2
-
Lift 3