Title Page
-
Conducted on
-
Prepared by
-
Instructions: This inspection record will be completed every month. Please mark “good” for criteria meeting expectations. If any response requires elaboration, do so in the Notes space provided. Further descriptions or comments should be attached on a separate sheet of paper if necessary.
Inspection Criteria
Genset EG-1 AST
-
Tank/container surfaces (note signs of leakage, verify proper labeling)
-
Notes
-
Tank bolts, rivets, seams and welds (note signs of corrosion, damage)
-
Notes
-
Tanks condition (note any damage, rust, or deteriorated)
-
Notes
-
Tank appurtenances: Level gauge, vent, fill port cap, drain (note any damage)
-
Notes
-
Tank supports (note erosion or settling)
-
Notes
-
Tank foundation (note any damage)
-
Notes
-
Level gauges or alarms condition (note if inoperative, damaged)
-
Notes
-
Vents, O-rings, Gaskets (note if vents are obstructed or gaskets & o-rings show deterioration)
-
Notes
-
Pipelines, hose, fittings, pumps, and supports (note if damaged or deteriorated)
-
Notes
-
Unloading area (note tanker containment availability, condition)
-
Notes
-
Connections (note if required caps or blanks are not in use)
-
Notes
-
Secondary and tanker containment (note condition, utilization, area drainage)
-
Notes
-
Verify that spill supplies are as described in this SPCC Plan (check all if adequate)
-
Notes
-
Interstice tank (check to ensure no product has leaked into interstice tank)
-
Notes
-
Water in tank (check to ensure no water is in the tank)
-
Notes
-
Fencing, gates, or lighting (note if non-functional)
-
Notes
-
Site drainage (note sediment that needs removal, excessive puddling or erosion)
-
Notes
Genset EG-2 AST
-
Tank/container surfaces (note signs of leakage, verify proper labeling)
-
Notes
-
Tank bolts, rivets, seams and welds (note signs of corrosion, damage)
-
Notes
-
Tanks condition (note any damage, rust, or deteriorated)
-
Notes
-
Tank appurtenances: Level gauge, vent, fill port cap, drain (note any damage)
-
Notes
-
Tank supports (note erosion or settling)
-
Notes
-
Tank foundation (note any damage)
-
Notes
-
Level gauges or alarms condition (note if inoperative, damaged)
-
Notes
-
Vents, O-rings, Gaskets (note if vents are obstructed or gaskets & o-rings show deterioration)
-
Notes
-
Pipelines, hose, fittings, pumps, and supports (note if damaged or deteriorated)
-
Notes
-
Unloading area (note tanker containment availability, condition)
-
Notes
-
Connections (note if required caps or blanks are not in use)
-
Notes
-
Secondary and tanker containment (note condition, utilization, area drainage)
-
Notes
-
Verify that spill supplies are as described in this SPCC Plan (check all if adequate)
-
Notes
-
Interstice tank (check to ensure no product has leaked into interstice tank)
-
Notes
-
Water in tank (check to ensure no water is in the tank)
-
Notes
-
Fencing, gates, or lighting (note if non-functional)
-
Notes
-
Site drainage (note sediment that needs removal, excessive puddling or erosion)
-
Notes
Genset EG-3 AST
-
Tank/container surfaces (note signs of leakage, verify proper labeling)
-
Notes
-
Tank bolts, rivets, seams and welds (note signs of corrosion, damage)
-
Notes
-
Tanks condition (note any damage, rust, or deteriorated)
-
Notes
-
Tank appurtenances: Level gauge, vent, fill port cap, drain (note any damage)
-
Notes
-
Tank supports (note erosion or settling)
-
Notes
-
Tank foundation (note any damage)
-
Notes
-
Level gauges or alarms condition (note if inoperative, damaged)
-
Notes
-
Vents, O-rings, Gaskets (note if vents are obstructed or gaskets & o-rings show deterioration)
-
Notes
-
Pipelines, hose, fittings, pumps, and supports (note if damaged or deteriorated)
-
Notes
-
Unloading area (note tanker containment availability, condition)
-
Notes
-
Connections (note if required caps or blanks are not in use)
-
Notes
-
Secondary and tanker containment (note condition, utilization, area drainage)
-
Notes
-
Verify that spill supplies are as described in this SPCC Plan (check all if adequate)
-
Notes
-
Interstice tank (check to ensure no product has leaked into interstice tank)
-
Notes
-
Water in tank (check to ensure no water is in the tank)
-
Notes
-
Fencing, gates, or lighting (note if non-functional)
-
Notes
-
Site drainage (note sediment that needs removal, excessive puddling or erosion)
-
Notes
Tanker Containment
-
Tank bolts, rivets, seams and welds (note signs of corrosion, damage)
-
Notes
-
Unloading area (note tanker containment availability, condition)
-
Notes
-
Secondary and tanker containment (note condition, utilization, area drainage)
-
Notes
-
Verify that spill supplies are as described in this SPCC Plan (check all if adequate)
-
Notes
-
Site drainage (note sediment that needs removal, excessive puddling or erosion)
-
Notes
-
Comments
-
Inspector Signature
-
Please upload the inspection log onto Intelex when completed, and keep a hard copy of the completed form on file at the facility for 3 years