Title Page
-
Building
-
Area
-
Elevation
-
Works
-
Commencement date
-
Certa manager
Pre installation
undefined
-
Does site have construction issue drawings?
-
Have project specific calculations & drawings been developed for the system?
-
Is the substructure in line with current system tolerences?
-
Have any changes to design been approved?
Installation
Installation
-
type of works
-
Have correct materials been delivered to site?
-
Has area been primed in line with manufacturer guidelines
-
Sopra board VCL installed in line with manufacturers guidelines (80mm Side laps/150mm End laps)
-
Coltack Evolution adhesive installed in line with manufacturer guidelines
-
Torch on felt layer one installed in line with manufacturer guidelines (80mm Side laps/150mm End laps
-
Torch felt Layer two installed in line with manufacturer guidelines (80mm Side laps/150mm End laps
-
Has area been checked for damage?
-
Photographic evidence
-
Liner sheet Installed?
-
Butyl Sealant installed?
-
Quattro Bracket and bar installed?
-
Insulation Installed with no gaps?
-
Liner sheet installed with fixings at correct location?
-
Certa manager inspections carried out?
-
Photographic evidence?
Snagging
-
Has area been snagged by a Certa manager?
-
Photos of identified snags
-
Photos of closed out snags
-
Is area ready for final QA inspection?
Final QA inspection
Final QA inspection to be carried out by Certa QA manager or senior Certa manager
-
Have all sections of this form been completed?
-
Has area been installed correct to drawings?
-
Has area been snagged and de-snagged?
-
Are works of a high quality standard?
-
Is area ready for handover to Roberston construction?
-
Final QA photos