MWREMS1
-
Site/project reference
-
Date of inspection
-
Name of person completing this inspection
-
Location/place of intended use of power tool
-
Plant/site identification number of the power tool and description of what it is?
-
If possible, upload picture(s) of equipment (inc tags, labels & overall condition)
power tool checklist
-
Is the power tool in good working order?
-
Is the power tool clean and free from any grease, oil, debris, off cuts, or any other items that may cause the equipment or guards to not work properly?
-
Is the power tool being used for its intended purpose?
-
Is the power tool equipped with all necessary safety guards as supplied by manufacturer?
-
Are all grips/handles, triggers/switches intact and good working order?
-
Are any blades, bits, cutting/grinding tools or any other attachments associated with the equipment in good condition, undamaged and suitable fitment/adjustment/setting correct for proper use with the equipment use as intended by the manufacturer?
-
Are any adjustment/fitment tools associated with the equipment attached (or in the storage box) correct for intended use on the equipment?
-
When was the last maintenance check performed on the power tool?
-
Is the tool within its current PAT date?
-
Are all plugs, cables, cord grips and cable supports intact and working ok?
-
(where applicable) Are all rubber feet, legs and any other supports that keep the tool on a flat and level surface all intact?
-
Does this tool pass as an acceptable standard to be put into normal use?
-
Comments or issues to be addressed